base-period price
- 01
Railway estimate (budget) price adjustment rules: the labour/materials/plant three-line adjustment method and its place in the item-estimate procedure (TB 10801-2024 section 4.1, Table 2.6.2)
TB 10801-2024 clause 4.1.1: price adjustment means the reasonable adjust…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第4.1节、第3.2节、第3.14节、第2.6节及Table 2.6.2TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway worksTB/T 10813-2024 · Base Period Prices of Materials for Railway Engineering2026-09-25 - 02
Whether published price information / base-period prices include freight and miscellaneous charges: price-caliber determination (ex-factory caliber excludes, delivered-to-site caliber includes) and the A/B/C classification of railway base-period prices
Whether price information includes transport charges depends on the publ…
GB/T 50875-2013TB 10801-2024TB 10813-20242026-09-25 - 03
Whether published price information / base-period prices include the procurement and keeping fee: caliber determination (railway base-period prices fully include, most provincial price information excludes, highway adds separately)
The procurement and keeping fee is added by rate and not merged into the…
GB/T 50875-2013TB 10801-2024TB 10811-20242026-09-25 - 04
Sources of base prices in the highway 2018 quota system: labour and material base prices from JTG/T 3832-2018 Appendix IV, plant rate base prices from JTG/T 3833-2018, and the distinction between base prices and budget charging prices
In the highway 2018 quota system: (1) labour and material base prices co…
JTG/T 3832-2018 · Budget Quota of Highway Engineering (附录四:人工、材料基期价格)JTG/T 3833-2018 · Quota for Shift Costs of Highway Engineering MachineryJTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects2026-09-25 - 05
Railway 2024 quota-norm system price fluctuation provision: formula, annual growth-rate selection, and distinction from compilation-period adjustment for price differentials (TB 10801/10811-2024)
The price fluctuation provision (TB 10811-2024 clause 2.14.1) is compute…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法 第3.14节、第4.1节、第2.5.1条、Table 2.6.2TB 10811-2024 铁路基本建设工程设计概(预)算费用定额 第2.14节(公式2.14.1)2026-09-25 - 06
Framework of causes for the gap between quota norms and actual market construction costs: social-average vs contractor-specific levels, base-period vs market prices, six source dimensions, and practical responses
Quota norms are a pricing benchmark compiled under normal construction c…
GB/T 50875-2013 工程造价术语标准GB 50501-2007 水利工程工程量清单计价规范TB 10801-2024 铁路基本建设工程设计概(预)算编制办法2026-09-25