Sources of base prices in the highway 2018 quota system: labour and material base prices from JTG/T 3832-2018 Appendix IV, plant rate base prices from JTG/T 3833-2018, and the distinction between base prices and budget charging prices
In the highway 2018 quota system: (1) labour and material base prices come from Appendix IV of JTG/T 3832-2018 "Highway Works Budget Quota Manual" (base-period price determination); (2) plant rate base prices per machine-shift come from JTG/T 3833-2018 "Plant Rate Norms per Machine-Shift for Highway Works" (the companion quota to JTG 3820/3830/3821/3831/3832-2018; 13 classes, 972 sub-items; the plant rate per machine-shift comprises 7 components: depreciation, overhaul, maintenance, erection/dismantling auxiliary, labour, power and fuel, and other costs). Base prices serve only the computation of norm-based direct cost (norm-based labour cost + norm-based material cost + norm-based plant cost) and of the fees calculated on that base; for budget preparation, labour cost, material cost and plant cost shall be computed at compilation-period prices in accordance with JTG 3830-2018 (plant rates per machine-shift being analysed and calculated per JTG/T 3833-2018) — the base price is not the budget charging price.
Applicable Codes
- JTG/T 3832-2018 · Budget Quota of Highway Engineering (附录四:人工、材料基期价格)
- JTG/T 3833-2018 · Quota for Shift Costs of Highway Engineering Machinery
- JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects
- JTG 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction Projects
- JTG/T 3821-2018 · Estimate Indicators of Highway Engineering
- JTG/T 3831-2018 · Estimate Quota of Highway Engineering
- DB63/T 2011-2022 · Guideline for Budget Compilation of Highway Maintenance Works (Qinghai) 第3.15条
- DB63/T 2013-2022 · Budget Quota for Highway Maintenance Works (Qinghai) 第4.8条
Topic Positioning
The sources and uses of "base prices" in the highway 2018 quota system: which documents the labour, material and plant rate per machine-shift base prices come from, what computations they serve, and how they differ from compilation-period budget charging prices (applicable to the preparation of feasibility-stage cost estimates, preliminary estimates and budgets for highway new-build, reconstruction/extension and maintenance works).
Core Conclusions
(1) Sources of base prices (two lines): (1) labour and material base prices — Appendix IV of JTG/T 3832-2018 "Highway Works Budget Quota Manual" (base-period price determination tables for labour and materials); (2) plant rate base prices per machine-shift — JTG/T 3833-2018 "Plant Rate Norms per Machine-Shift for Highway Works". Corroborating provisions: DB63/T 2011-2022 "Guidelines for Budget Preparation of Highway Maintenance Works", Clause 3.15: "base prices are calculated in accordance with Appendix IV of JTG/T 3832-2018 and JTG/T 3833"; DB63/T 2013-2022 "Budget Quota for Highway Maintenance Works", Clause 4.8: "the labour cost and material cost in base prices are calculated per JTG/T 3832, and the plant cost per JTG/T 3833 and DB63/T 2014".
(2) Key points of JTG/T 3833-2018 (general notes, verbatim): this quota is the companion quota to the "Administrative Compilation Rules for Investment Estimates of Highway Construction Projects" (JTG 3820-2018), the "Administrative Compilation Rules for Preliminary Estimates and Budgets of Highway Construction Projects" (JTG 3830-2018), the "Highway Works Estimate Indicators" (JTG/T 3821-2018), the "Highway Works Preliminary Estimate Quota" (JTG/T 3831-2018) and the "Highway Works Budget Quota Manual" (JTG/T 3832-2018), and is the basis for preparing feasibility-stage cost estimates, preliminary estimates and budgets for highway construction works; it covers 13 classes and 972 sub-items in total, including earthwork plant, pavement plant, concrete and mortar plant, etc.; each machine (vessel) shift is calculated as 8 h (diving equipment 6 h; transformers and switchgear one day-and-night); the plant rate per machine-shift comprises 7 cost components: depreciation (including smart information-management equipment), overhaul, maintenance, erection/dismantling auxiliary, labour, power and fuel, and other costs.
(3) Use of base prices: norm-based direct cost = the norm resource consumption of labour, materials and plant multiplied by the corresponding base prices, comprising norm-based labour cost, norm-based material cost and norm-based plant cost; base prices also serve as the base to which percentage rates are applied for fees calculated on norm-based direct cost / norm-based labour cost (such as preliminaries).
(4) Base price is not the budget charging price: per item 2 of the general notes of JTG/T 3832-2018, when preparing a budget the labour cost, material cost and plant cost shall be calculated in accordance with the "Administrative Compilation Rules for Preliminary Estimates and Budgets of Highway Construction Projects" (JTG 3830-2018) — that is, at compilation-period prices: labour at the all-in daily labour rate published for the project location, materials at norm-based material prices for estimating (original price + freight and handling charges + off-site transport loss + purchasing and custody charges); plant rates per machine-shift are analysed and calculated per JTG/T 3833-2018 (general note 14: re-analysed using compilation-period power and fuel prices, etc.). One-line memory: resource consumption from 3832, plant rates per machine-shift from 3833; base-period prices (base prices) for the base to which percentage rates are applied, compilation-period prices for budget amounts.
Applicable Boundaries
- Applies to budget preparation for highway new-build and reconstruction/extension works (JTG/T 3832-2018 is the national highway specialty quota, the basis for preparing construction-drawing based budgets (pre-tender estimates) and the foundation for preparing preliminary estimate quotas/indicators); the same logic applies to the calculation of norm-based direct cost in maintenance works budgets.
- Base prices are fixed base-period prices, used only to calculate norm-based direct cost and the base to which percentage rates are applied; they must never be used directly as compilation-period budget unit prices; budget amounts are calculated at compilation-period prices per JTG 3830-2018.
- Norm resource consumption must not be adjusted because the project execution plan (construction methodology and site organization), operating methods or material consumption of a specific project differ from the quota provisions (except where the quota permits substitution); plant types and specifications must never be substituted when they differ from actual conditions.
- Where concrete or mortar strength grades or cement strength grades differ from the quota, substitution may be made per the Appendix II mix design adjustment tables; admixture costs are calculated separately per design requirements; where commercial concrete is used, the cement, sand, gravel and concrete consumption is adjusted per general note 11.
- Material consumption already includes on-site transport and operation losses, and no further addition may be made in budget preparation; off-site transport losses and warehouse custody losses are accounted for within the norm-based material price for estimating.
Further Reading
- JTG/T 3832-2018 "Highway Works Budget Quota Manual", general notes (items 1-16: nature of the quota, scope of application, consumption basis, mix design adjustment, commercial concrete adjustment, plant rates per machine-shift analysed per JTG/T 3833-2018, etc.) and Appendix IV (base-period price determination tables for labour and materials).
- JTG/T 3833-2018 "Plant Rate Norms per Machine-Shift for Highway Works", general notes (companion documents, 13 classes and 972 sub-items, 8 h shift rule, 7 cost components).
- JTG 3830-2018 "Administrative Compilation Rules for Preliminary Estimates and Budgets of Highway Construction Projects": provisions on the calculation of labour cost, material cost and plant cost (compilation-period price basis).
- Corroboration and comparison: DB63/T 2011-2022 "Guidelines for Budget Preparation of Highway Maintenance Works", Clause 3.15 (definition of norm-based direct cost); DB63/T 2013-2022 "Budget Quota for Highway Maintenance Works", Clause 4.8 (division of base-price calculation).
Keywords
- 基价
- norm-based direct cost
- JTG/T 3832-2018
- JTG/T 3833-2018
- highway works budget quota manual
- plant rate norms per machine-shift
- 附录四
- base-period price
- 公路2018定额体系