norm-based direct cost
- 01
Highway works staple-and-supplementary food freight subsidy: composite mileage computation, rate selection and boundary rules (JTG 3830-2018 / JTG 3820-2018 clause 3.1.7)
Composite mileage = grain haul × 0.06 + fuel haul × 0.09 + vegetable hau…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.7条JTG 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction Projects 第3.1.7条2026-09-25 - 02
Highway works JTG 3830-2018 composition of overheads (company and site): the five items — basic fee, staple and non-staple food freight subsidy, staff home-visit travel expenses, staff heating subsidy and financial costs — and the bases to which percentage rates are applied (clause 3.1.7)
JTG 3830-2018 clause 3.1.7: highway overheads (company and site) compris…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.7条、第3.1.6条、App. D2026-09-25 - 03
Whether purchased materials enter the bases to which percentage rates are applied for preliminaries and overheads (company and site) in highway preliminary estimates (budgets): the ministry JTG 3830-2018 base system and local exclusion rules (Qinghai DB63/T 2011-2022, Beijing DB11/T 1509-2018)
The ministry JTG 3830-2018 does not itemize exclusions of purchased mate…
JTG 3830-2018 公路工程建设项目概算预算编制办法DB63/T 2011-2022 公路养护工程预算编制指南DB11/T 1509-2018 公路工程设计导则2026-09-25 - 04
Highway 2018 quota system profit: base = quota direct costs + measures + enterprise management, rate 7.42% (JTG 3830-2018 clause 3.1.9)
Per clause 3.1.9 of JTG 3830-2018 "Measures for compiling estimates and…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第 3.1.9 条、第 3.1.10 条2026-09-25 - 05
Sources of base prices in the highway 2018 quota system: labour and material base prices from JTG/T 3832-2018 Appendix IV, plant rate base prices from JTG/T 3833-2018, and the distinction between base prices and budget charging prices
In the highway 2018 quota system: (1) labour and material base prices co…
JTG/T 3832-2018 · Budget Quota of Highway Engineering (附录四:人工、材料基期价格)JTG/T 3833-2018 · Quota for Shift Costs of Highway Engineering MachineryJTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects2026-09-25 - 06
Highway estimate/budget construction-auxiliary fee base: quota direct costs x Table 3.1.6-8 rates (JTG 3830-2018 clause 3.1.6 item 6)
The highway construction-auxiliary fee is charged on the base "quota dir…
JTG 3830—2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.1条、第3.1.6条第6款、Table 3.1.6-8JTG/T 3832—2018 · Budget Quota of Highway Engineering 附录四JTG/T 3833 · Quota for Shift Costs of Highway Engineering Machinery2026-09-25