protection of completed works
- 01
Estimating and apportioning the protection-of-finished-work cost (protection cost of completed works and equipment): two paths — the percentage-rate method and the actual-cost method
The protection-of-finished-work cost belongs to preliminaries (GB/T 5050…
GB/T 50500-2024GB/T 50875-2013JGJ/T 427-20182026-09-25 - 02
Panorama of suspension cost items for non-contractor-caused stoppages (T/YJXB 0001-2023: protection / standstill / wages / management / profit / demobilization / price rises / statutory fees)
For non-contractor-caused stoppages, the contractor may claim suspension…
T/YJXB 0001-2023 第2.0.1、4.0.1~4.0.22条GB/T 51262-2017 第5.8.3条GB/T 50500-2024 第8.11.9、8.11.12条2026-09-25 - 03
Settlement during suspension: completed qualified work settled as normal + suspension costs shared by cause (employer/contractor/force majeure)
Suspension settlement splits into two ledgers: qualified completed work…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51262-2017 建设工程造价鉴定规范T/YJXB 0001-2023 建设工程停工承包人费用计算标准2026-09-25