builder's hoist
- 01
Determining whether vertical transport preliminaries double count the machine-shift rates of tower cranes and builder's hoists: the BOQ item coding basis, the inclusion and exclusion boundaries in provincial consumption quota chapter notes, and a method of checking whether the plant rate is included or excluded via the machine-shift content and unit of measurement of quota line items
No double counting. The machine-shift running rates of tower cranes and…
GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 App. R 第R.1.1条、第R.2.3条及Table R.1.1(措施项目,code 011601)GB 50854-2013 房屋建筑与装饰工程工程量计算规范 App. S Table S.3(垂直运输,code 011703)江苏省建筑与装饰工程消耗量定额(2026版)垂直运输工程 章说明2026-10-25 - 02
Supply–demand balance calculation for the number of builder's hoists
The number of builder's hoists is determined from code selection paramet…
JGJ 3-2010 高层建筑混凝土结构技术规程JGJ 215-2010 建筑施工升降机安装使用拆卸安全技术规程DBJ/T 15-92-2021 高层建筑混凝土结构技术规程(广东)2026-09-25 - 03
Coordinated positioning of tower cranes, construction hoists, and material stockyards in the general construction site layout
Tower cranes, construction hoists, and material stockyards shall be posi…
GB/T 50502-2009 建筑施工组织设计规范JGJ 196-2010 建筑施工塔式起重机安装、使用、拆卸安全技术规程JGJ 3-2010 高层建筑混凝土结构技术规程2026-09-25 - 04
Vertical transportation quantity calculation: buildings by floor area (incl. basements) x eave-height steps, structures by count/volume, rules for height-increase fees
Vertical transportation is a preliminaries (measures) item; the BOQ cove…
GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准GB/T 50860-2024 构筑物工程工程量计算标准TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程2026-09-25