as-built drawing certification stamp
- 01
Determining the drawing basis for the final account: as-built drawings govern (as-built drawings + variation/site instruction records jointly verify the work actually completed), with construction drawings serving as the benchmark for contract-scope definition and variation-difference comparison
The final account is based on the as-built drawings — more fully stated…
GB/T 50326-2017 第18.3.3条GB/T 50500-2024 第7.1.1条GB/T 50500-2024 第7.1.8条2026-09-25 - 02
The role of as-built drawings in construction payment settlement: statutory basis status and graphical benchmark for audit quantity checks
As-built drawings are a statutory basis for the final account and the gr…
GB/T 50326-2017GB/T 51095-2015GB/T 50328-20142026-09-25 - 03
Rules for supplementing and correcting as-built drawings when they are inconsistent with actual site conditions
As-built drawings must faithfully reflect the actual completed state of…
DB62/T 25-3016-2016 建筑工程资料管理规程DB37/T 5073-2016 建筑工程(建筑设备、安装与节能工程)施工资料管理规程CJJ/T 180-2012 城市轨道交通工程档案整理标准2026-09-25