Rules for supplementing and correcting as-built drawings when they are inconsistent with actual site conditions

As-built drawings must faithfully reflect the actual completed state of the works: any content where the as-built state differs from the original design construction drawings must all be accurately reflected per the as-built state. Three handling categories by degree of change—no change: stamp the original drawings; ordinary changes: revise on the original drawings noting the change basis; major changes (structural form/process/layout/project altered) or more than 1/3 of the sheet changed: redraw. In all cases as-built drawings must bear the as-built stamp and be archived by discipline.

Applicable Codes

  • DB62/T 25-3016-2016 建筑工程资料管理规程
  • DB37/T 5073-2016 建筑工程(建筑设备、安装与节能工程)施工资料管理规程
  • CJJ/T 180-2012 城市轨道交通工程档案整理标准
  • DB11/T 695-2017 建筑工程资料管理规程

Topic Positioning

General rules for compiling and correcting as-built drawings: how to supplement, revise, or redraw as-built drawings when the completed state differs from the original design construction drawings.

Core Conclusions

  1. Supreme principle: as-built drawings must faithfully reflect the actual completed state; any content not matching the original design construction drawings must all be accurately shown per the as-built state.
  2. Three handling categories by degree of change: (1) no change, built to drawings—stamp the as-built stamp directly on the original construction drawings; (2) ordinary changes—revise on the original construction drawings (must be new blueprints), annotate the modified parts, attach the design change notice and construction notes, and stamp the as-built stamp; (3) major changes (structural form, process, plan layout, or project altered) or more than 1/3 of the sheet changed—redraw, with the as-built stamp.
  3. Revision essentials: annotations and graphics uniformly use black durable writing material; lettering in FangSong style with sizes consistent with the original; modified content must not exceed the drawing border; where one negotiation involves multiple sheets, each sheet must be revised; voided sheets are crossed out in the index and new sheets listed with name and number.
  4. Redrawing responsibility split: design-caused—designer redraws; construction-caused—contractor redraws; other causes—owner draws or commissions the designer.
  5. All as-built drawings must bear the as-built stamp (red ink, Song typeface, "AS-BUILT" in size-2 characters, others size-4), be compiled and summarized by discipline with the as-built drawing register completed; for general contracting, each subcontractor compiles and the general contractor verifies and consolidates.

Applicable Boundaries

Applies to compiling and correcting as-built drawings for new, rebuilt, and expanded projects. "Major change" is bounded by altered structural form, process, plan layout, or project, or more than 1/3 of the sheet changed; where site practice differs from drawings without change procedures, the change/negotiation confirmation must first be completed before revising drawings—do not "carry the error forward," and do not merely copy change documents without verifying actual site conditions.

Further Reading

See DB62/T 25-3016-2016 Specification for Management of Building Engineering Documents, Article 5.14.1 (compilation requirements, redrawing responsibility, stamp specifications); DB37/T 5073-2016 Specification for Construction Document Management of Building Engineering (Building Services, Installation and Energy Saving), Article 7.0.2 (three compilation forms and redrawing conditions); CJJ/T 180-2012 Standard for Organizing Urban Rail Transit Engineering Archives, Article 5.3.2 (revision forms and writing materials); DB11/T 695-2017 Appendix F (as-built drawing revision and folding details).

Keywords