as-built drawings
- 01
Handling inconsistencies between the content of site instructions and certified records and as-built drawings: written clarification -> adjustment to facts -> report record -> construction cost expert assessment (judicial appraisal) per facts / site survey
An inconsistency between a site instruction / variation record and the a…
法释〔2020〕25号 第二十条法释〔2026〕12号 第二十三条(2026-06-30施行)GB/T 51095-2015 第8.3.6条2026-10-29 - 02
Cost expert assessment of quantity disputes under unit-rate contracts: the stepped determination where design drawings are missing or cannot show the quantities, and the handling of missing construction or as-built drawings
With design drawings, the assessor re-computes the quantities on the dra…
T/ZBD 100.4-2023 第4.3.5条、第4.3.6条T/ZBD 100.4-2023 第4.6.3条GB/T 51262-2017 第5.4.1条2026-10-01 - 03
Determining the drawing basis for the final account: as-built drawings govern (as-built drawings + variation/site instruction records jointly verify the work actually completed), with construction drawings serving as the benchmark for contract-scope definition and variation-difference comparison
The final account is based on the as-built drawings — more fully stated…
GB/T 50326-2017 第18.3.3条GB/T 50500-2024 第7.1.1条GB/T 50500-2024 第7.1.8条2026-09-25 - 04
Bases for determining final account quantities: completed qualifying quantities + measurement certification and sign-off lock-in + measurement method by contract type
The final account quantity (in FIDIC contexts, the Final Statement plus…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51095-2015 建设工程造价咨询规范GB/T 50326-2017 建设工程项目管理规范2026-09-25 - 05
The role of as-built drawings in construction payment settlement: statutory basis status and graphical benchmark for audit quantity checks
As-built drawings are a statutory basis for the final account and the gr…
GB/T 50326-2017GB/T 51095-2015GB/T 50328-20142026-09-25 - 06
Rules for supplementing and correcting as-built drawings when they are inconsistent with actual site conditions
As-built drawings must faithfully reflect the actual completed state of…
DB62/T 25-3016-2016 建筑工程资料管理规程DB37/T 5073-2016 建筑工程(建筑设备、安装与节能工程)施工资料管理规程CJJ/T 180-2012 城市轨道交通工程档案整理标准2026-09-25