FIDIC Red Book (Conditions of Contract for Construction)
- 01
The FIDIC Engineer's measure-value-pay chain of duties: Red Book 12.1/12.2/12.3/14.1 and the 2017 differences
Yes - and central duties. The FIDIC Red Book is a re-measurement contrac…
FIDIC Conditions of Contract for Construction, 1st Edition 1999(红皮书)Sub-Clause 3.2/3.5/12.1/12.2/12.3/14.1/14.6/14.7/14.13FIDIC Conditions of Contract for Construction, 2nd Edition 2017(红皮书)Sub-Clause 3.1/3.7/12.2/12.3/14.1FIDIC Conditions of Contract for Plant and Design-Build, 1st Edition 1999(黄皮书)Sub-Clause 3.12026-09-25 - 02
The FIDIC Clause 1 term "Cost" (1999 Red Book 1.1.4.3 vs 2017 1.1.19/1.1.20) and the three payment calibers: Cost / Cost Plus Profit / 12.3 "reasonable cost plus reasonable profit"
Capitalized "Cost" is a Clause 1 defined term: all expenditure reasonabl…
FIDIC Conditions of Contract for Construction (Red Book), 1st Edition 1999, Sub-Clause 1.1.4.3FIDIC Conditions of Contract for Construction, 2nd Edition 2017, Sub-Clauses 1.1.19 & 1.1.20FIDIC Red Book 1999 Sub-Clause 12.3 [Evaluation]2026-09-25 - 03
FIDIC Red Book 2017 EOT (8.5/20.2) vs GB/T 50500-2024 Section 8.11 delay-claim regime: the 28-day cadence, cost-and-time in one case, three-way liability, and the critical-path causation threshold
FIDIC 2017 Red Book EOT (Sub-Clause 8.5; procedure per 20.2) and GB/T 50…
FIDIC Conditions of Contract for Construction, 2nd Edition 2017, Sub-Clause 8.5/8.7/20.2, Clause 18GB/T 50500-2024 建设工程工程量清单计价标准 第8.11节2026-09-25 - 04
FIDIC 2017 Red Book Sub-Clause 8.8 Delay Damages: trigger, daily rate, cap, sole-remedy character, and the linked risks of 8.2/20.2/15.2/17.4
Under FIDIC 2017 Red Book 8.8: where the contractor fails to complete by…
FIDIC Conditions of Contract for Construction, 2nd Ed. 2017 (Red Book): Sub-Clause 8.8 Delay Damages; 相关 8.2/8.5/8.9、15.2、17.4、20.2GB/T 50500-2024 建设工程工程量清单计价标准 第 8.11.3、8.11.4、8.11.19 条、第 2.0.33 条GB/T 50875-2013 建设工程造价术语标准 第 3.4.6 条2026-09-25 - 05
Claims under FIDIC 2017 (Red/Yellow Book Chapter 20) compared with construction claims under China's GB/T 50500-2024: institutional positioning, the hard/soft divide of the 28-day time bar, and the procedural nodes of claims in both directions
FIDIC 2017's Claim is a "procedure unifier" - clause 20.1 (a)(b)(c) cove…
FIDIC Conditions of Contract for Construction(红皮书 2017 第二版)第20章 20.1~20.2.7FIDIC Conditions of Contract for Plant and Design-Build(黄皮书 2017)第20章GB/T 50500-2024 建设工程工程量清单计价标准 第8.1.1、8.11.1~8.11.6条2026-09-25 - 06
The Engineer in FIDIC contracts: an employer-appointed contract-administration office, the 1999->2017 neutralization of its role, and its functional mapping onto the domestic supervision/chief supervision engineer system
The FIDIC Engineer is not a professional title or the designer: it is a…
FIDIC Conditions of Contract for Construction (Red Book) First Edition 1999, Sub-Clause 3.1/3.2FIDIC Conditions of Contract for Plant and Design-Build (Yellow Book) First Edition 1999, Sub-Clause 3.1FIDIC Conditions of Contract 2017 (Second Edition) 红/黄皮书 Sub-Clause 3.1/3.4/3.72026-09-25 - 07
The non-equivalence of FIDIC 2017 Red Book delay machinery and the national-standard delay regime: delay fact / EOT / Delay Damages vs delay claims / extensions / delay damages / liquidated damages
Not equivalent. FIDIC never treats delay as a single term: it is a chain…
FIDIC Conditions of Contract for Construction (Red Book), Second Edition 2017, Sub-Clauses 8.2/8.5/8.8/10.1/20.2GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 2.0.33 条、第 8.11.3~8.11.19 条GB/T 50875-2013 · Standard glossary of project costs 第 3.4.6 条2026-09-25 - 08
Core philosophy of the FIDIC standard contract suite: the three fundamental principles (official 2017 wording) and the risk-gradient spectrum of the Red/Yellow/Silver Books
When FIDIC (the International Federation of Consulting Engineers) launch…
FIDIC Conditions of Contract for Construction (Red Book), 2nd edition 2017, 前言FIDIC 2017 版发布新闻稿(fidic.org)GB/T 50500-2024 第 3.3.1~3.3.8 条(对比参照)2026-09-25 - 09
The contractual definition and form requirements of a Notice under FIDIC 2017 Red Book (1.1.56 + 1.3): formal compliance is constitutive - a non-compliant document is not a Notice
In FIDIC 2017 Red Book, Notice is a term of art: 1.1.56 defines "'Notice…
FIDIC Conditions of Contract for Construction (Red Book), 2nd ed. 2017 — Sub-Clause 1.1.56, 1.1.57, 1.3, 3.7.5, 20.1, 20.2.1, 20.2.4~20.2.7, 21.4.4FIDIC Conditions of Contract for Plant and Design-Build (Yellow Book), 2017 — 索赔通知条款(同 28 天规则)2026-09-25 - 10
The FIDIC suite of contracts: the rainbow family, each book's positioning and boundaries, the core mechanism framework, and the China-international mapping gateway
The standard conditions of contract published by FIDIC (the Internationa…
FIDIC Conditions of Contract for Construction(Red Book,1999/2017 第2版)FIDIC Conditions of Contract for Plant and Design-Build(Yellow Book,1999/2017 第2版)FIDIC Conditions of Contract for EPC/Turnkey Projects(Silver Book,1999/2017 第2版)2026-09-25 - 11
The FIDIC Performance Certificate (Red Book Clauses 11.9/11.10) mapped against the domestic completion acceptance - defect liability period - final settlement system: correspondences and differences
Performance Certificate is not Performance Bond. FIDIC Red Book 11.9: th…
FIDIC 红皮书 1999 第 11.9~11.10 条FIDIC 红皮书 2017 第 2 版第 11.9~11.10 条GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 10.5.5、10.5.8 条2026-09-25 - 12
FIDIC 2017 Red Book Sub-Clause 10.1 Taking-Over Certificate mechanism and the chain of legal consequences from the Date of Completion
The contractor may apply for the TOC by Notice no more than 14 days befo…
FIDIC Conditions of Contract for Construction 2017 (2nd Ed) Red Book, Sub-Clause 10.1/10.2/10.3FIDIC 2017 Red Book Sub-Clause 8.8 Delay Damages / 8.2 Time for CompletionFIDIC 2017 Red Book Sub-Clause 11.1/11.9, 14.9, 17.1, 4.2.3, 20.22026-09-25 - 13
FIDIC Red Book 2017 Variations vs China's variation/new-works regime (13.1 vs GB/T 50500-2024 2.0.28/2.0.30, 8.1.1 and T/ZBD 100.4-2023 4.6.1)
The two share one origin and structure: GB/T 50500-2024 term 2.0.28 "var…
FIDIC《施工合同条件》(红皮书)2017 年第 2 版 Sub-Clause 13.1 (Variations)GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 术语 2.0.28/2.0.30、第 8.1.1 条T/ZBD 100.4-2023 · Work Guideline for Construction Cost Appraisal 第 4.6.1 条2026-09-25