rate build-up
- 01
The rate build-up path from quota line items to the all-in unit rate of a BOQ item and the cost calculation procedure: divisional work item cost as BOQ quantity x all-in rate, sum of quota line item amounts / BOQ item quantity (3 decimal places for quantities, 2 for rates), the three pricing methods, the analysis sheet identical to the BOQ rate, and the taxed versus tax-exclusive cost structures
The all-in unit rate of a BOQ item is converted as 'sum of quota line it…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 2.0.9、2.0.10、3.1.5、3.1.7 条GB/T 51095-2015 · Code for construction cost consultation 第 5.3.8、5.3.9 条及App. CGB/T 50875-2013 · Standard glossary of project costs 第 2.3.6 条2026-10-25 - 02
Six-step labour-material-plant analysis for the all-in unit rate: apply quota line items -> take consumption and compilation-period unit prices -> add management fee and profit -> fill the all-in unit rate analysis sheet
Labour-material-plant analysis splits the all-in unit rate by "consumpti…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51095-2015 建设工程造价咨询规范TB 10801-2024 铁路基本建设工程设计概(预)算编制办法2026-09-25 - 03
Definition and cost composition of the all-in unit rate (GB/T 50500-2024 Clause 2.0.9, GB/T 50875-2013 Clause 2.2.58)
All-in unit rate = labour cost + material cost (including engineering eq…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9条GB/T 50875-2013 工程造价术语标准 第2.2.58条2026-09-25