settlement procedure
- 01
Contractor's objection period and tiered remedies against final account review results (GB/T 50500-2024)
After receiving the settlement verification/review result, the contracto…
GB/T 50500-2024 建设工程工程量清单计价标准建设部令第107号 建筑工程施工发包与承包计价管理办法GB/T 51095-2015 建设工程造价咨询规范2026-09-25 - 02
Incorporating design changes (designer-issued variations) into the final account: position of the final account price item, pricing ladder, and procedural requirements
Once a design change (designer-issued variation) is confirmed and establ…
GB/T 50500-2024 建设工程工程量清单计价标准建设部令第107号 建筑工程施工发包与承包计价管理办法GB/T 50326-2017 建设工程项目管理规范2026-09-25 - 03
Interim settlement by construction stage (stage settlement) in GB/T 50500-2024 (Section 10.2): node agreements, procedure flow, price calculation, and differences from the one-off final account under GB 50500-2013
GB/T 50500-2024 first establishes "interim settlement by construction st…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50500-2013 建设工程工程量清单计价规范法释〔2004〕14号 最高人民法院关于审理建设工程施工合同纠纷案件适用法律问题的解释第二十条2026-09-25