witnessed sampling and testing
- 01
Supervision review of quality certificates of materials entering site, and the contractual stipulation of witness sampling and parallel testing (GB/T 50319-2013 cl. 5.2.9 etc.)
Per GB/T 50319-2013 cl. 5.2.9, the project supervision body shall review…
GB/T 50319-2013 · Code for Construction Project Supervision 第5.2.9、5.2.13、2.0.15、2.0.16条及Table B.0.6建建〔2000〕211号《房屋建筑工程和市政基础设施工程实行见证取样和送检的规定》《建设工程质量管理条例》(2017修订)第三十一条2026-09-25 - 02
Casting and counting concrete test cubes: standard curing, same-condition curing, and impermeability specimens
Standard-cured cubes: sample ≥1 per 100 batches and not more than 100 m³…
GB/T 50107-2010 混凝土强度检验评定标准GB 50204-2015 混凝土结构工程施工质量验收规范DB22/T 5040-2020 建设工程见证取样检测标准2026-09-25 - 03
Rules for determining retest items and retest frequency (lotting and sampling counts) for materials delivered to site
Retest items are fixed by the "general provisions" of each chapter of th…
GB 50210-2018 建筑装饰装修工程质量验收标准GB 55016-2021 建筑环境通用规范GB 50204-2015 混凝土结构工程施工质量验收规范2026-09-25