permanent equipment procurement cost
- 01
The basis and cost attribution of the equipment-versus-material division in construction pricing (GB/T 50531-2009 general provisions, including process-type principal materials treated as equipment)
Per GB/T 50531-2009: divide equipment from material by supply scope, cha…
GB/T 50531-2009 · Standard for Classification of Equipment and Materials for Construction Cost Pricing 第1.0.3、2.0.1、2.0.2、2.0.4、2.0.6、2.0.7、3.1.1、3.1.4、3.1.5、3.1.7、3.2.2、3.2.3、3.2.4、4.1.2 条及Table 4.1.2JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects App. C 设备与材料的划分标准 C.0.1~C.0.32026-09-30 - 02
Railway 2024 quota system equipment purchase cost: composition and booking — equipment price + equipment freight and handling charges, rate standards, and the nature boundary against installation works cost (TB 10801-2024 Section 3.10 / TB 10811-2024 Section 2.10)
Equipment purchase cost = equipment price + equipment freight and handli…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction ProjectsTB 10811-2024 · Fee schedule for design estimates and budgets of capital railway worksGB/T 50531-2009 · Standard for Classification of Equipment and Materials for Construction Cost Pricing2026-09-25 - 03
Highway estimate/budget equipment purchase costs: four components — original price, freight, transport insurance, procurement and storage (JTG 3830-2018 clause 3.1.3)
Per clause 3.1.3 of JTG 3830-2018 "Measures for compiling estimates and…
JTG 3830-2018 公路工程建设项目概算预算编制办法(第3.1.3条、第3.1.1条、第3.1.2条、App. C)2026-09-25 - 04
Highway investment estimate — permanent equipment procurement cost at the project-proposal stage: by the Appendix C rate on the norm-based cost of works (excluding special fees and itself) (JTG 3820-2018 Clause 3.1.3)
Per Clause 3.1.3 item 1 of JTG 3820-2018 "Measures for Compiling Investm…
JTG 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction Projects 第3.1.3条JTG/T 3821—2018 · Estimate Indicators of Highway Engineering 附录一JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.3条2026-09-25