railway basic (fundamental) quota manual
- 01
TB/T 10821-2024 basic quota Chapter 2 formwork pricing: steel/plastic/timber formwork selection, the timber fabrication/erection split (YY-23 + YY-24), amortization conversion, and falsework listed separately
In TB/T 10821-2024 Chapter 2, formwork fabrication-erection and removal…
TB/T 10821-2024 · Basic Quota of Railway Engineering Ch. 2 模板与辅助结构TB/T 10821-2024 Ch. 9 辅助结构材料及半成品摊销2026-09-25 - 02
Determining amortization cycles and per-cycle amortization cost of consumable formwork materials (railway basic quota basis)
Look up the number of reuses (amortization cycles) in the quota take-off…
TB/T 10821-2024 铁路工程基本定额 Ch. 92026-09-25 - 03
Railway 2024 quotas: applying concrete mixing/transport items — HT-0 placing items exclude mixing, transport, and materials; use basic-quota Chapter 4, with haul as loading/unloading + per-1 km increments (TB/T 10821-2024)
Under the railway 2024 quotas, concrete cost is applied in four segments…
TB/T 10821-2024 铁路工程基本定额TB/T 10822-2024 铁路工程预算定额 Vol. 1 路基工程TB/T 10825-2024 铁路工程预算定额 Vol. 4 轨道工程2026-09-25