material requisition against quota limits
- 01
Linked verification method for the four quantities "procurement plan — site entry — acceptance — payment" of engineering materials (voucher anchors and three-way matching)
The four quantities are anchored on vouchers: the procurement plan quant…
GB/T 50430-2017 工程建设施工企业质量管理规范 第8.2.1/8.2.3/8.3.1条T/CIAS-5-2022 数据中心机电工程技术规程 第5.2.1条GB/T 50500-2024 建设工程工程量清单计价标准 第3.6.3条2026-09-25 - 02
How to judge whether material procurement quantities exceed reasonable demand (the reasonable procurement yardstick and over-procurement signals)
Reasonable procurement quantity = planned quantity (works quantity × con…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50430-2017 工程建设施工企业质量管理规范GB/T 50326-2017 建设工程项目管理规范2026-09-25 - 03
Four-quantity reconciliation (planned/purchased/issued/actually consumed) for materials and quota-based material issue control
Four-quantity reconciliation follows the chain "set plans by quota, cont…
GB/T 50326-2017 建设工程项目管理规范GB/T 50640-2023 建筑与市政工程绿色施工评价标准DB11/T 513-2018 绿色施工管理规程2026-09-25 - 04
Identifying abnormal over-consumption in material requisitions: verification paths and an anomaly signal checklist
Five steps to identify abnormal over-consumption: set the baseline (plan…
GB/T 50500-2024 第3.6.2、3.6.3条GB/T 50875-2013 第2.3.16条T/ZBD 100.4-2023 第4.5.7条2026-09-25