equitable risk allocation
- 01
Defining the scope of adjustable (price-adjustable) materials: locked by contract annex tables, not share thresholds; auxiliary and low-value materials outside adjustment (neither coefficient-merged nor overheads-lumped); the negotiation channel for unlisted materials' abnormal swings (GB/T 50500-2024 clauses 3.3.1, 3.3.5, 8.7.3, 8.7.5, 8.7.6; Appendix G.2, A.2.1)
GB/T 50500-2024 sets no material-cost share threshold: the adjustable sc…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 3.3.1 条GB/T 50500-2024 第 3.3.5 条GB/T 50500-2024 第 8.7.2 条2026-10-25 - 02
Validity limits of "all risks borne by the contractor" clauses and statutory exclusions (GB/T 50500-2024 + Civil Code)
"All risks borne by the contractor" clauses are "uncapped risk allocatio…
GB/T 50500-2024 建设工程工程量清单计价标准中华人民共和国民法典2026-09-25 - 03
Diagnosing the causes of subcontract unit prices exceeding main-contract revenue unit prices (cost inversion) and staged disposal methods
For subcontract inversion, first identify the cause: caliber misalignmen…
GB/T 50500-2024 第8.7.3条、第8.4.1条GB/T 50326-2017 第7.4.3条、第11.1.3条、第11.3.2条GB/T 50358-2017 第7.4.3条2026-09-25 - 04
Determining the pricing risk scope within the all-in unit rate: contract agreement first + statutory fallback of GB/T 50500-2024 Sections 3.3/8.7
Risk-scope determination follows 'contract agreement first, statutory fa…
GB/T 50500-2024 建设工程工程量清单计价标准 第3.3.1~3.3.6条GB/T 50500-2024 第8.7节GB/T 50500-2024 App. A2026-09-25