The FIDIC suite of contracts: the rainbow family, each book's positioning and boundaries, the core mechanism framework, and the China-international mapping gateway
The standard conditions of contract published by FIDIC (the International Federation of Consulting Engineers) are known as the 'rainbow suite'. The three flagship books were re-issued in second editions in December 2017: the Red Book, Conditions of Contract for Construction (works designed by the Employer, administered by the Engineer, paid on BOQ rates); the Yellow Book, Conditions of Contract for Plant and Design-Build (the Contractor designs to the Employer's Requirements); and the Silver Book, Conditions of Contract for EPC/Turnkey Projects (the Contractor takes total responsibility for design and execution, for employers seeking higher certainty of final price and time — risk tilts towards the Contractor). The 2008 Gold Book extends the chain into an operation service period (design-build-operate). Further members: the Green Book (short form), the White Book (client-consultant services agreement), the Pink Book (MDB-harmonised construction conditions) and the Emerald Book (tunnelling and underground works). Five core mechanisms: (1) the Engineer as the contract administrator appointed by the Employer, with a strengthened duty to act fairly in 2017 — functionally adjacent to, but institutionally different from, China's mandatory supervision regime; (2) Variation under Clause 13 — initiated by instruction, valued first against contract rates, provisional rates allowed in interim payments (13.3.1), with no separation of in-contract and out-of-contract work; (3) claims formalities — Notice is a defined term (1.1.56/1.3), the Notice of Claim must be given within 28 days (20.2.1) on pain of time bar, and disputes go DAAB, then amicable settlement, then arbitration; (4) the three time anchors and taking-over — commencement date, programme and time for completion, the Taking-Over Certificate at substantial completion (10.1), and delay damages as a daily, capped, often sole remedy (8.8); (5) close-out through the Defects Notification Period and the Performance Certificate (11.9/11.10) — the same names but different machinery than China's completion-acceptance, defects liability and final closure chain. China-international mapping must follow institutional difference, not literal translation (site visa is not 'site visa'; final account, not 'completion settlement'; provisional sums). The gateway: the mapping sections of 25 term entries and 15 FIDIC cards on this site.
FIDIC conditions of contract are the most widely used standard-form system in international construction;