Cushion layer of long-auger pumped plain-concrete pile composite foundations: materials, loose placement thickness computation and compaction workmanship (DB11/T 1832.1-2021)

Beijing DB11/T 1832.1-2021 Construction Work Procedure Part 1: Foundation Works, Chapter 9: cushion materials should be medium sand, coarse sand, graded sand-gravel or crushed stone, maximum particle size preferably not over 30mm (cl. 9.1.2); materials, laying range and thickness per design; loose placement thickness dH = h/lambda (h = design cushion thickness; lambda = compaction fill ratio, preferably 0.9 per design), compacted to design thickness h with small plant such as electric plate compactors or frog rammers (cl. 9.4.9); do not disturb the soil between piles when laying the cushion (cl. 9.6.4).

Applicable Codes

  • DB11/T 1832.1-2021 建筑工程施工工艺规程 第1部分:地基基础工程(Ch. 9 长螺旋压灌素混凝土桩复合地基)

Topic Positioning

Workmanship requirements for the cushion layer of long-auger pumped plain-concrete pile composite foundations: material selection, loose placement thickness computation, compaction plant and precautions, per Chapter 9 (long-auger pumped plain-concrete pile composite foundations) of Beijing local standard DB11/T 1832.1-2021.

Core Conclusions

  1. Materials (cl. 9.1.2): cushion materials should be medium sand, coarse sand, graded sand-gravel or crushed stone; maximum particle size preferably not over 30mm.
  2. Laying and compaction (cl. 9.4.9): materials, laying range and thickness per design; loose placement thickness dH computed by formula (9.4.9), compacted with small plant to thickness h, where dH = loose thickness; h = design thickness; lambda = compaction fill ratio, per design, preferably 0.9. That is, loose thickness = design thickness / fill ratio (dH = h/lambda); after loose placement, compact to design thickness h. Prefer electric plate compactors or frog rammers and similar small plant.
  3. Precaution (cl. 9.6.4): do not disturb the soil between piles when laying the cushion.

Applicable Boundaries

  • This card is from the Beijing local standard DB11/T 1832.1-2021, for long-auger pumped plain-concrete pile composite foundations in Beijing; other regions or pile types follow their current local codes and design — no direct transplanting.
  • The default fill ratio 0.9 is "per design" — design provisions prevail.
  • Only for cushions of this pile type; codes differ on particle-size caps and compaction methods for other composite foundations (e.g. rigid-flexible pile codes are stricter) — use the code applicable to the works; do not mix.

Further Reading

See DB11/T 1832.1-2021 Chapter 9 "long-auger pumped plain-concrete pile composite foundations": cl. 9.1.2 (materials and max particle size), 9.4.9 (loose thickness formula and small-plant compaction), 9.6.4 (no disturbance of inter-pile soil). Read the rest of Chapter 9 (pile positioning, pile formation, quality control) for the full process.

Keywords

  • 褥垫层
  • 长螺旋压灌素混凝土桩
  • 复合地基
  • DB11/T 1832.1
  • 虚铺厚度
  • 夯填度
  • 电动平板夯