Termination-of-driving criteria and final penetration control values for driven precast piles (Beijing DB11/T 1832.1-2021, industry JGJ/T 406-2017, Guangdong DBJ/T 15-152-2019, Shenzhen SJG 126-2023)

Final penetration control values at termination follow the project's local standard: Beijing DB11/T 1832.1-2021 cl. 14.4.9 — final penetration preferably not over 30mm/10 blows (not over 25mm/10 blows on thin strongly weathered rock over medium/slightly weathered rock); industry JGJ/T 406-2017 cl. 8.5.7 sets no fixed value, using the last 3 rounds (10 blows each) penetration as the quantitative control; note opposite regional directions — Guangdong DBJ/T 15-152-2019 requires final penetration preferably NOT LESS than 20mm/10 blows (anti-overdriving), Shenzhen SJG 126-2023 uses primary/auxiliary controls by pile type with per-round decrease and follower penetration 4-6mm smaller. Do not transplant values across regions.

Applicable Codes

  • DB11/T 1832.1-2021 · Specification for Construction Technology of Building Works (Part 1: Foundation Works) (Beijing) 第14.4.9条
  • JGJ/T 406-2017 · Technical Standard for Prestressed Concrete Pipe Piles 第8.5.7条
  • DBJ/T 15-152-2019 · Specification for Construction of Building Foundations (Guangdong) 第14.4.12条
  • SJG 126-2023 · Technical Standard for Pile Foundation Construction (Shenzhen) 第4.4.5条

Topic Positioning

How to set termination-of-driving criteria for driven precast piles (incl. prestressed pipe piles) and the value of "final penetration" — the core quantitative indicator — consolidating and comparing Beijing DB11/T 1832.1-2021, industry JGJ/T 406-2017, Guangdong DBJ/T 15-152-2019 and Shenzhen SJG 126-2023, for construction, supervision and cost personnel.

Core Conclusions

I. Beijing DB11/T 1832.1-2021 cl. 14.4.9 (driving termination)

  1. Criteria shall be set comprehensively from geology, pile bearing behavior, characteristic single-pile capacity, pile specification and embedment, hammer performance and energy, bearing stratum and tip penetration into it, and final penetration.
  2. Final penetration preferably not over 30mm/10 blows; on a thin strongly weathered bearing layer over medium/slightly weathered rock, not over 25mm/10 blows — then one round of blows may be measured, and if it meets the criterion, driving may stop.
  3. With hydraulic hammers under penetration control, reduce the stroke near design depth — stroke preferably not over 70cm.
  4. Criteria shall be verified by static load test piles or trial driving, drawing on adjacent experience.
  5. Where geology varies, total blows and last-1m blows serve as auxiliary criteria: total blows preferably not over 3000/2500/2000 for UHC/PHC/PC piles; last-1m blows not over 350/300/250.

II. Industry JGJ/T 406-2017 cl. 8.5.7 (prestressed concrete pipe piles) No fixed value: criteria shall be set comprehensively from geology, bearing behavior, characteristic capacity, pile specification and embedment, hammer performance and energy, bearing stratum and tip penetration, final penetration or per-meter blow counts over the last 1-3m. Generally the bearing stratum is the qualitative indicator and final penetration or last-meter blows the quantitative one; the most used quantitative indicator is final penetration, generally judged over the last 3 rounds (10 blows each). Given complex geology, final penetration is not the sole indicator; the ultimate purpose is single-pile capacity and settlement control.

III. Guangdong DBJ/T 15-152-2019 cl. 14.4.12 (note the opposite direction)

  1. Friction piles controlled by tip level shall reach design length;
  2. Penetration should be measured 3 times consecutively; final penetration preferably not less than 20mm/10 blows (against overdriving);
  3. Per-meter blow counts over the last 1-3m shall satisfy requirements. Termination principle: generally tip-level control primary, penetration secondary; where the tip reaches hard/plastic cohesive soil, medium-dense-plus silt/sand/gravel or weathered rock, penetration control is primary; where penetration is met but level is not, continue 3 rounds of 10 blows each and confirm by penetration not exceeding the design value.

IV. Shenzhen SJG 126-2023 cl. 4.4.5 (driving termination)

  1. Friction piles: length and level control; friction-end-bearing: design tip level primary, final penetration auxiliary; end-bearing-friction: final penetration primary, level auxiliary;
  2. Final penetration should be measured 3 times consecutively; terminate when each round's penetration decreases successively and reaches the criterion; on bearing layers <=3.0m thick over medium/slightly weathered rock, final penetration may be reduced, and measurement reduced to once;
  3. The follower (chaser) penetration control value follows the no-follower value under identical conditions — since the chaser-to-head connection is non-rigid with energy loss, follower termination penetration (per round) may be 4-6mm smaller than without.

V. Common principles (all four): bearing stratum is the qualitative indicator; final penetration or last-1m blows the quantitative one; others (embedment, per-meter blows, total blows) are references. Criteria must be verified by trial driving/static tests; the goal is capacity assurance and settlement control.

Applicable Boundaries

  • Values are regional and may point in opposite directions: Beijing "not over 30mm/10 blows" vs Guangdong "not less than 20mm/10 blows" — never transplant; execute the project's local standard and design; stricter design prevails.
  • Criteria are not fixed: set comprehensively from geology, bearing behavior, capacity, specification/embedment, hammer and energy, bearing stratum and penetration depth, and verify by trial piles; final penetration is not the sole control.
  • Only for driving (diesel/hydraulic hammers); static pressing and vibratory methods do not apply. For hydraulic hammers under penetration control mind the <=70cm stroke.

Further Reading

  • Beijing: DB11/T 1832.1-2021 cl. 14.4.9;
  • Industry: JGJ/T 406-2017 cl. 8.5.7 (construction chapter);
  • Guangdong: DBJ/T 15-152-2019 cl. 14.4.12 (precast concrete piles);
  • Shenzhen: SJG 126-2023 cl. 4.4.5 (follower penetration correction in the commentary).