Railway 2024 design estimate (budget) VAT listing scheme: rate steps, taxable base and the tax-exclusive caliber (TB 10801/TB 10811-2024)
Under the railway 2024 estimate (budget) system, VAT is listed as a price-external tax in its own chapter (TB 10801-2024 section 3.12): VAT = VAT on construction and installation works costs + VAT on equipment purchase costs + VAT on other costs, not entering the item estimate (budget) value. Rates are stepped per TB 10811-2024 Table 2.12.1: sale of goods 13% (office and living furniture purchase, tools and production furniture purchase); construction services 9% (construction and installation works costs, equipment purchase costs, work-safety costs); transport services 9% (living-supplies transport subsidy); R&D and technical services 6% (survey and design fees, construction-coordination fees on operating lines, research and test fees); authentication and consulting services 6% (land acquisition/demolition working funds, construction supervision fees etc., 11 items); information-technology services 6% (computer software development fees). No VAT is listed on land acquisition compensation, demolition compensation, temporary land fees, compensation for overlain mineral deposits, crop compensation, comprehensive-development land, staff training fees, owner's stamp duty and other taxes, exchange gains/losses, and import duties and VAT; for self-built projects the project-construction management fee carries no VAT, while for agent-built projects it does. The taxable base = each cost item's amount exclusive of deductible input VAT; labor/materials/plant all enter the costs tax-exclusive; input tax enters no cost item; VAT is listed outside the item estimate (budget) value as "tax-exclusive amount x applicable rate".
Applicable Codes
- TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects
- TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works
- TB/T 10813-2024 · Base Period Prices of Materials for Railway Engineering
- TB/T 10814 · Quota for Shift Costs of Construction Machinery and Tools of Railway Engineering
Topic Positioning
This card covers the value added tax (VAT) rules for railway 2024 capital construction design estimates (budgets): the VAT rate categories (TB 10811-2024 Table 2.12.1), the tax base (exclusive of deductible input VAT), the list of cost items that carry no VAT, and the interfaces with the calculation procedure for individual construction and installation works estimates (TB 10801-2024 Table 2.6.2). It applies to cost engineers compiling or auditing estimates (budgets) under the 2024 railway cost system.
Core Conclusions
Overall framework (TB 10801-2024 §3.12): 3.12.1 VAT means the VAT amount to be calculated in accordance with the composition of the design estimate (budget) and the relevant provisions of national tax law; 3.12.2 VAT = VAT on construction and installation works costs + VAT on permanent equipment procurement costs + VAT on other costs; 3.12.3 VAT is calculated in accordance with the "Norms for on-costs and expenses for design estimates (budgets) of railway capital construction projects" TB 10811. Commentary 2.5.1–2.6.3 notes that, in order to properly reflect VAT's nature as a price-exclusive tax, VAT is given its own chapter and the composition of cost items and the calculation procedure for individual estimates (budgets) were adjusted accordingly. VAT is listed alongside construction and installation works costs, permanent equipment procurement costs and other costs as a component of static investment (Fig. 2.6.1); it does not enter the value of an individual estimate (budget).
VAT rate categories (TB 10811-2024 Table 2.12.1 VAT listing scheme, retained as in the original):
- Sale of goods 13%: office and living furniture purchase costs and tools and production furniture purchase costs within production preparation costs
- Construction services 9%: construction and installation works costs, permanent equipment procurement costs, statutory work safety levy
- Transport services 9%: living supplies transport subsidy
- R&D and technical services 6%: survey and design fees, works coordination on operating lines, research and test fees
- Certification and consulting services 6%: land acquisition and demolition working funds, land boundary survey fees, land pre-examination fees, temporary land reclamation report preparation fees, project preliminary-stage fees, construction supervision fees, design document review fees, other consulting service fees, integrated testing and commissioning and related fees, third-party monitoring fees, whole-process engineering consulting service fees
- Information technology services 6%: computer software development fees
Items carrying no VAT (notes to Table 2.12.1): within other costs — land requisition compensation, demolition compensation, temporary land fees, compensation for mineral resources overlain by the works, crop compensation; comprehensively developed land; staff training fees within production preparation costs; owner's stamp duty and other taxes; and, within foreign-capital-related costs, exchange gains/losses and import duties and VAT. For railway projects built by the owner itself, the project construction management fee carries no VAT; for projects built by an agent, it does. For the medical equipment and medical services included in the health protection fee for railway works in plateau and severe-cold regions, the corresponding VAT listing scheme is determined in accordance with the relevant state policies.
Tax base and interfaces with the calculation procedure: for an individual construction and installation works estimate (TB 10801-2024 Table 2.6.2): norm-based direct works cost = base-period labour cost + base-period material cost + base-period plant and small tools cost; direct works cost = norm-based direct works cost + freight and handling not included in the price + total price differences + fill material cost; direct cost = direct works cost + preliminaries [(base-period labour cost + base-period plant and small tools cost) × preliminaries rate] + special construction addition; value of the individual estimate (budget) = direct cost + on-costs [(base-period labour cost + base-period plant and small tools cost) × on-costs rate]. This value of the individual estimate (budget) excludes VAT — VAT is listed separately as the corresponding cost item's amount exclusive of deductible input VAT multiplied by the applicable rate (e.g. VAT on construction and installation works costs = its tax-exclusive amount × 9%). For an individual equipment estimate (Table 2.6.3): equipment cost (calculated from the design equipment quantities and the equipment price at source adopted) + equipment freight and handling charges (equipment cost × equipment freight and handling rate) = value of the individual estimate (budget), and VAT on permanent equipment procurement costs is listed separately as that value × 9%.
Tax-inclusive/tax-exclusive treatment of the three elements — labour, materials and plant: all enter the costs on a basis exclusive of deductible input VAT; input VAT enters no cost item; VAT is listed separately only at the outer layer.
- Materials: TB/T 10813-2024 clause 1.0.3 — the base-period prices are at the 2020 price level and exclude deductible input VAT; clause 1.0.4 — class A base-period price = material price at source × (1 + purchasing and custody charges rate), class B = composite ex-works price × (1 + rate), class C = (material price at source + freight and handling included in the material price) × (1 + rate).
- Labour: the composite labour rate already includes the "five insurances and one fund", trade union funds and staff education funds formerly within statutory fees (commentary 3.1.4); labour itself raises no input VAT credit issue and enters directly on a tax-exclusive basis.
- Plant: construction machinery machine-shift rates comprise depreciation, overhaul, maintenance, erection and dismantling, labour, power and other costs, and construction instrument and meter machine-shift rates comprise depreciation, maintenance, calibration and power costs (TB 10801-2024 clauses 3.3.4 and 3.3.5); base-period machine-shift rates are calculated using the fuel prices in TB/T 10813 together with the base-period composite labour rate and base-period water and electricity rates of these norms, and compilation-period machine-shift rates are calculated using compilation-period prices (TB 10811-2024 clause 2.3.2).
Applicable Boundaries
- Applies to railway capital construction design estimates (budgets) compiled under TB 10801-2024 and TB 10811-2024 (feasibility study estimate, preliminary design estimate and budget stages); material base-period prices apply to the preparation of works norms, estimates, preliminary estimates and budgets, while prices at the construction stage are determined by the market (TB/T 10813-2024 clause 1.0.2).
- Table 2.12.1 sets out the railway sector's basis for listing estimate (budget) costs; it is aligned with the general national VAT rules but is applied in a different context; VAT treatment in actual construction payment settlement (choice of the general or simplified VAT scheme, input VAT credit, tax burden analysis) follows tax law and the relevant pricing standards and is outside the scope of this card.
- The list of items carrying no VAT must be checked item by item to avoid double taxation of compensatory and tax-type costs; the VAT treatment of the project construction management fee differs between the self-built and agent-built construction management models.
- This card gives no specific rate values (preliminaries rates, on-costs rates, equipment freight and handling rates, purchasing and custody charges rates, etc. are all looked up by works category in the corresponding tables of TB 10811-2024); use it together with the current text of the norms for on-costs and expenses.
Further Reading
- TB 10801-2024 "Measures for compiling design estimates (budgets) of railway capital construction projects": §3.12 (VAT), §2.6 (composition of cost items and calculation procedures for individual estimates (budgets), Tables 2.6.1/2.6.2/2.6.3), §3.3 (plant and small tools cost), §4.1 (adjustment for price differentials in design estimates (budgets)), commentary 2.5.1–2.6.3 and 3.1.4.
- TB 10811-2024 "Norms for on-costs and expenses for design estimates (budgets) of railway capital construction projects": §2.12 Table 2.12.1 (VAT listing scheme), §2.3 (determination of machine-shift rates for plant and small tools).
- TB/T 10813-2024 "Base-period prices of railway works materials": clauses 1.0.3 and 1.0.4 (price level and tax-exclusive basis, composition of class A/B/C material base-period prices).
- TB/T 10814 "Machine-shift cost norms for railway works plant and small tools": basis for calculating construction machinery machine-shift rates and construction instrument and meter machine-shift rates.