Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

Ambient conditions for anti-corrosion coating of steel structures: temperature, relative humidity, dew point, and weather (GB 50755-2012 Clause 13.3.2 etc.)

The governing provision is Clause 13.3.2 of GB 50755-2012 "Code for construction of steel structures": where the product datasheet is silent, the ambient temperature should be 5-38 C, relative humidity not greater than 85%, steel surface temperature at least 3 C above the dew point and not exceeding 40 C; no condensation on the surface; outdoor coating stops in rain, fog, snow, or strong wind; protection against rain and dust within 4h after coating; spraying outdoors is inappropriate above force-5 wind. The commentary to Clause 14.1.4 of GB 50205-2001 explains the mechanism: in direct sun the steel surface runs 8-12 C above air temperature (normally 2-3 C), blisters above 43 C; film freezes below 0 C; above 85% humidity dew condenses and adhesion drops; the best window is from 3h after sunrise to 3h after sunset. Beijing applies the stricter DB11/T 1832.5-2023 Clause 22.4.4: RH preferably below 80%, and for epoxy coatings the steel surface temperature at least 10 C for spraying.

Applicable Codes

  • GB 50755-2012 · Code for Construction of Steel Structures 第 13.3.2 条
  • GB 50205-2001 · Code for Acceptance of Construction Quality of Steel Structures 第 14.1.4 条及条文说明
  • DB11/T 1832.5-2023 · Specification for Construction Technology of Building Works (Part 5: Steel Structure Works) (Beijing) 第 22.4.4 条
  • GB 50205-2020 · Standard for Acceptance of Construction Quality of Steel Structures
  • JGJ/T 251-2011 · Technical Specification for Corrosion Protection of Building Steel Structures

Topic Positioning

This card consolidates the requirements on ambient temperature, relative humidity, dew point, weather, and post-coating protection for anti-corrosion coating (paint systems: primer / intermediate / finish and on-site recoating) of steel structures, combining Clause 13.3.2 of GB 50755-2012 "Code for construction of steel structures", the commentary to Clause 14.1.4 of GB 50205-2001 "Code for construction quality acceptance of steel structure works", and Beijing local standard DB11/T 1832.5-2023 Clause 22.4.4, for direct reuse in work plans, technical briefings, and site compliance checks.

Core Conclusions

1. Governing provision: GB 50755-2012 Clause 13.3.2 Ambient temperature and humidity for coating shall, in addition to the paint datasheet, comply with: 1 Where the datasheet is silent on temperature and humidity: ambient temperature 5-38 C, RH not greater than 85%, steel surface temperature at least 3 C above the dew point and not exceeding 40 C; 2 No condensation on the surface being coated; 3 Stop outdoor coating in rain, fog, snow, or strong wind, and avoid working under intense direct sunlight; 4 Protective measures within 4h after coating against rain and dust; 5 Spraying outdoors is inappropriate when wind exceeds force 5.

2. Mechanism (commentary to Clause 14.1.4 of GB 50205-2001)

  • The 5-38 C band suits indoor work without direct sun; normally the steel surface runs 2-3 C above air temperature; in direct sun it can run 8-12 C higher, while paint films tolerate only about 40 C - above 43 C the film blisters and locally lifts, reducing adhesion.
  • Below 0 C, outdoor films freeze and cure poorly; above 85% RH, dew condenses on the steel and adhesion suffers.
  • The best window is from 3h after sunrise (surface dew essentially dry) to 3h after sunset (indoor work unrestricted), when RH has not yet recovered and the surface retains enough warmth to prevent dew formation.
  • The film surface is not cured within 4h and is easily damaged by rain - hence no rain within 4h.

3. Beijing caliber: DB11/T 1832.5-2023 Clause 22.4.4 (some indices stricter) 1 Ambient temperature per the paint datasheet; RH preferably below 80% (stricter than the national <= 85%); control the steel surface temperature against the dew point, at least 3 C above it; for epoxy coatings the steel surface temperature shall be at least 10 C before spraying; the dew point may be read from Table 22.4.4 of that code by air temperature and RH; no work in rain, fog, snow, or heavy dust. 2 Areas that must remain uncoated (anchor bolts and base plates with design or workmanship requirements, high-strength bolt faying surfaces, areas against or embedded in concrete) shall be masked before coating; paints shall be shaken well before opening, and show no skinning, caking, or gelling; use only matching thinners to adjust viscosity; coats and thicknesses per the design; recoat intervals per the datasheet; the first primer coat shall run in one direction with neat laps; after erection perform secondary anti-corrosion coating (primer and intermediate done in shop, site touch-up: clean damaged and uncoated areas with sandpaper or power wire brush before recoating); after completion inspect and record, analyze and repair film defects with the same methods and requirements as the original coating.

4. Precedence: where the paint datasheet specifies, follow it; otherwise apply the code defaults.

Applicable Boundaries

  • Applies to ambient-condition control and acceptance checks for on-site anti-corrosion (paint) coating of building steel structures; primer, intermediate, finish, and post-erection recoating all covered.
  • DB11/T 1832.5-2023 is a Beijing local standard enforced only for Beijing projects; elsewhere GB 50755-2012 Clause 13.3.2 governs.
  • The GB 50205-2001 Clause 14.1.4 commentary serves to understand the mechanism behind the figures (sun heating, 43 C blistering, 0 C freezing, 85% condensation, best window 3h after sunrise to 3h after sunset); current acceptance follows GB 50205-2020 "Standard for construction quality acceptance of steel structure works".
  • This card covers anti-corrosion paints only - not fireproof coatings (separate acceptance) or shop line / powder coating processes (follow the product process requirements).
  • The temperature / humidity figures are code defaults / minimums; a stricter datasheet prevails.

Further Reading

  • Governing: GB 50755-2012 "Code for construction of steel structures" Clause 13.3.2 "coating" (temperature, RH, dew point, weather, post-coating protection).
  • Mechanism: GB 50205-2001 Clause 14.1.4 and commentary (5-38 C scope, sun heating, 43 C blistering, 0 C freezing, 85% condensation, best window, 4h rain ban).
  • Beijing: DB11/T 1832.5-2023 Clause 22.4.4 and Table 22.4.4 "dew point lookup table (C)" (RH < 80%, epoxy >= 10 C surface temperature, dew point by table).
  • Further: JGJ/T 251-2011 "Technical specification for anti-corrosion of building steel structures" Clause 5.2.4 (checking frequency, thermo-hygrometer measurement, dew-point conversion per Appendix D); GB 50205-2020 (current acceptance standard).

Keywords

  • 钢结构
  • 防腐涂装
  • 涂装环境
  • 露点温度
  • 相对湿度
  • GB 50755
  • GB 50205
  • DB11/T 1832.5
  • 涂装作业
  • 环境温度

Cited By