Basic construction safety requirements of the Construction Law (2019 amendment): key points of Chapter 5 on construction safety management
The main line is "prevention first + responsibility to persons": uphold safety first and prevention first, establishing safety-production responsibility and mass-prevention systems; decoration involving changes to the main body or load-bearing structure requires a design scheme from the original or a qualified design institute first — no construction without one; sites must maintain safety, guard against danger, prevent fire, and protect adjacent buildings and special work environments; construction enterprises implement safety responsibility systems — the legal representative is responsible enterprise-wide, and the general contractor is responsible site-wide; no work without safety training; work-injury insurance per law; workers are entitled to protective equipment and to report life-endangering practices.
Applicable Codes
- 中华人民共和国建筑法(2019修正)第五章第三十六至五十一条
- 中华人民共和国建筑法(2019修正)第七十条
Topic Positioning
This card summarizes the legal-level basic construction safety requirements of Chapter 5 "Construction Work Safety Management" (Articles 36-51) of the Construction Law (2019 amendment) — the safety obligations and responsibility division between construction enterprises and the owner.
Core Conclusions
Main line "prevention first + responsibility to persons": (1) Policy and systems: safety first, prevention first; establish work safety responsibility and mass-prevention-and-treatment systems (Article 36); (2) Decoration safety: decoration involving changes to the building's main body or load-bearing structure requires, before construction, a design scheme from the original design institute or one with corresponding qualifications — no construction without a scheme; unauthorized construction is ordered corrected and fined, with damages for losses and criminal liability where crimes are constituted (Articles 49, 70); (3) Site management: measures to maintain safety, guard against danger, and prevent fire; enclosed management where feasible; safety protection where adjacent buildings, structures, or special work environments may be harmed (Article 39); the owner provides underground pipeline data and the construction enterprise protects them (Article 40); (4) Responsibility division: construction administrative departments manage construction safety (Article 43); construction enterprises implement work safety responsibility systems with the legal representative responsible enterprise-wide (Article 44); site safety is the construction enterprise's responsibility — the general contractor's where general contracting; subcontractors are responsible to and obey the general contractor (Article 45); (5) Training: no work without work safety education and training (Article 46); (6) Insurance: work-injury insurance per law; accident insurance for dangerous-work employees encouraged (Article 48).
Applicable Boundaries
Framework, principle-level legal requirements; operational parameters for scaffolding, temporary electricity, deep excavations, etc. are detailed in the Safety Management Regulations and MOHURD rules. Based on the 2019 amendment (Presidential Order No. 29); article numbers follow the amended text; this card organizes provisions and is not legal advice.
Further Reading
See Construction Law (2019 amendment), Chapter 5, Articles 36-51, and Article 70 (penalties); read together with the construction safety provisions of the "Safety Management Regulations for Construction Projects" and the Work Safety Law.