TB/T 10831-2024 railway housing works quota: classification of cast-in-place slabs into beam-slab / flat-slab / plain-slab and the pricing rule of monolithic beams and slabs (FY-503~516)
Per TB/T 10831-2024 "Railway works budget quota, Volume 10: housing works", volume notes "10. Quantity calculation rules" item (7): beam-slab = slab cast integrally with primary and secondary beams, "computed as the sum of beam and slab volumes" — with monolithic casting the beam volume is merged into the beam-slab item and the beam is not applied separately; flat-slab = slab bearing directly on columns (with drop panels), "computed as the sum of slab and drop-panel volumes"; plain slab = slab bearing on walls (or ring beams), "computed as the solid volume of the slab". Corresponding items: FY-503~507 beam-slab, FY-508~512 flat-slab (both in five thickness steps <=100/<=150/<=200/<=300/>300 mm, unit 10 m3), FY-513 plain slab, FY-514/515 sloped roof slabs (with beams / without beams), FY-516 arch slab.
Applicable Codes
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程
Topic Positioning
This card covers, in TB/T 10831-2024 "Railway works budget quota, Volume 10: housing works", the classification basis, quantity rules and pricing points of the three classes of cast-in-place concrete slab items (beam-slab, flat-slab, plain slab), focusing on "when beams and slabs are cast integrally, is the beam volume merged into the slab or applied separately".
Core Conclusions
Per volume notes "10. Quantity calculation rules" item (7) "slabs": slabs are computed by design area times slab thickness, in volume (m3), in three classes:
- Beam-slab: slab cast integrally with primary and secondary beams. As written: "Beam-slab comprises primary and secondary beams and the slab, computed as the sum of beam and slab volumes." — with integral beam-slab casting, the volumes of primary and secondary beams are merged into the beam-slab item; no separate beam item is applied.
- Flat-slab: no beams, slab bearing directly on columns (with drop panels). As written: "Flat-slab is computed as the sum of the volumes of slab and drop panels."
- Plain slab: no beams, no drop panels, bearing directly on walls (or ring beams). As written: "Plain slab is computed as the solid volume of the slab."
Companion rules cross-confirm the classification (item (4) columns): "the column height of a beam-slab runs from the top of the column base (or the top of the floor slab) to the top of the floor slab above; the column height of a flat-slab runs from the top of the column base (or of the floor slab) to the underside of the drop panel" — the drop panel belongs to the flat-slab system, beams to the beam-slab system.
Beam length and interface rules (item (5)): "where a beam connects to a column, the beam length runs to the column face; where a secondary beam connects to a primary beam, the secondary beam length runs to the primary-beam face"; "where cast-in-place canopies or gutters connect to a slab (including roof and floor slabs), the external wall is the boundary; where they connect to a beam, the beam's outer edge line is the boundary"; "slab ends built into block walls are merged into the slab volume"; cast-in-place walls and slabs "do not deduct concrete volumes of holes up to 0.30 m2", while walls deduct door/window openings and holes over 0.30 m2.
Corresponding quota items (Chapter 1 Section 5 "concrete and reinforced-concrete works" (6) slabs, unit 10 m3): FY-503~507 cast-in-place beam-slab, five steps by thickness <=100/<=150/<=200/<=300/>300; FY-508~512 cast-in-place flat-slab, same five steps; FY-513 cast-in-place plain slab; FY-514/515 cast-in-place sloped roof slabs (with-beam / without-beam); FY-516 cast-in-place arch slab; FY-517/518 cast-in-place monolithic stairs (straight / curved, unit 10 m2 projected area). When applying, beam-slab and flat-slab take the step by actual slab thickness.
Applicable Boundaries
- These rules apply only to Volume 10 "Housing works" (TB/T 10831-2024) of the railway 2024 quota system, i.e. floor and roof slabs of buildings.
- Slab-type members of bridges, culverts, tunnels etc. (bridge deck slabs, track slabs) belong to the corresponding items of railway quota Volumes 2 and 4; the beam-slab/flat-slab/plain-slab classification and merge rules do not apply.
- Note the difference from the BOQ pricing caliber: GB/T 50854-2024 "Standard for measurement of building and decoration works" has cancelled the "beam-slab" BOQ item — beams are coded separately under "cast-in-place concrete beams" and ordinary floor slabs under "solid floor slabs"; quota pricing still follows this card's rules (beam volume merged into the beam-slab item); the two are separate BOQ and quota systems and must not be mixed.
Further Reading
- TB/T 10831-2024 "Railway works budget quota, Volume 10: housing works", volume notes "10. Quantity calculation rules" items (4)-(7) (columns, beams, walls, slabs) and item (12) reinforcement quantity rules.
- Chapter 1 Section 5 "concrete and reinforced-concrete works" (1) cast-in-place members (6) slab items FY-503~518.
- Comparative reading: GB/T 50854-2024 "Standard for measurement of building and decoration works" on the cancellation of the "beam-slab" BOQ item (BOQ caliber); slab items of other railway volumes such as Volume 3 TB/T 10824-2024 (tunnel works).
Keywords
- 有梁板
- 无梁板
- 平板
- 梁板整浇
- 现浇板
- railway works budget quota manual (China Railway)
- TB/T 10831-2024
- building works
- 混凝土工程量计算