Engineering Knowledge Cards.
Confidence HighUpdated 2026-11-14

Quota conventions for pipe supports and hangers (general supports, sliding/guiding/anchoring seats) calculated separately by design mass in kg: fabrication and installation items set apart, timber-padded and spring types merged in, outdoor above-ground structural-steel supports switched to the static equipment and process metal structures volume, sources of support spacing values (GB 50242-2002, DB11/T 1832.14-2022), and the double-counting boundary against the bill convention (GB/T 50856-2024 clause 3.0.10, supports already included)

Pipe-laying items exclude supports; supports are calculated separately by design mass in kg: Beijing DB11/T 2382-2024 appendix C sets C10-4-1 'fabrication, general pipe support' and C10-4-2 'installation, general pipe support' (both per 100 kg; the fabrication item carries 105 kg of section steel per 100 kg) - fabrication and installation must be applied as separate items; timber-padded and spring supports run the same items, with anti-corrosion timber pads and spring vibration isolators as main materials added; indoor supports and supports inside outdoor pipe trenches run the piping-volume support items, while above-ground structural-steel supports for outdoor pipes switch to appendix C.3, the static equipment and process metal structures volume (the most frequent mis-application on overhead works); support counts follow the maximum spacings of GB 50242-2002 table 3.3.8 and the anchor-support spacings and free-end lengths of DB11/T 1832.14-2022 tables 2.0.19-1 and 2.0.19-2, then weigh group by group off the standard drawings; under the bill convention (GB/T 50856-2024 clause 3.0.10) the work content already includes support fabrication, installation and painting - no separate bill item without a special design requirement.

Applicable Codes

  • DB11/T 2382-2024 App. C 通用安装工程 Table C.10.23-1 管道支架制作(C10-4-1 制作一般管架、C10-4-2 安装一般管架,单位100kg)
  • DB11/T 2382-2024 App. C.3 静置设备与工艺金属结构制作安装工程;6.10.4 刷油防腐绝热
  • 京建发〔2012〕538号 2012预算定额 通用安装第十册给排水采暖燃气工程 第四章 支架、套管及其他(说明一~十、工程量计算规则)
  • 京建发〔2021〕201号 2021预算消耗量标准 市政工程第四册 第九章 说明二(管道铺设子目不包括各种支架、卡板制作与安装)
  • GB/T 50856-2024 · Standard for measurement of general mechanical, electrical, plumbing and fire services 第3.0.10条、App. N(031301)、App. M
  • GB 50242-2002 · Code for Acceptance of Construction Quality of Water Supply, Drainage and Heating Works in Buildings 第3.3.8条 Table 3.3.8 钢管管道支架的最大间距
  • DB11/T 1832.14-2022《建筑工程施工工艺规程 第14部分:供暖工程》第2.0.19条 表2.0.19-1、2.0.19-2
  • TB/T 10832-2024 · Railway works budget quota manual: Water Supply and Drainage Works, Vol. 11 (2024 series) Ch. 3第三节 管道基础及支架(PY-365~PY-370)

Subject positioning

Measurement and item-selection conventions for pipe supports and hangers (sliding / guiding / anchoring seats, general supports, timber-padded and spring supports): whether they merge into pipe-laying items or are calculated separately in kg, how fabrication and installation items are split, the cross-volume attribution of outdoor above-ground structural-steel supports, the spacing sources for support counts, and the convention differences between the railway volumes (TB) and the municipal / installation volumes.

Core conclusions

1. Quota convention: pipe items exclude supports; supports are calculated separately by design mass in kg

Jing Jian Fa [2021] No. 201, 2021 consumption standard, municipal works volume 4, pipe networks (part 2), chapter 9, note 2: 'the pipe-laying items do not include the fabrication and installation of supports and clamps of any kind.'

Beijing DB11/T 2382-2024 appendix C (general installation works), table C.10.23-1 'pipe support fabrication', two items, both per 100 kg:

Item Name Main work content Main consumption (per 100 kg)
C10-4-1 Fabrication, general pipe support Yard haulage, setting out, cutting, straightening, hot bending, drilling, beveling, welding, fabrication All-in labour class 2, 4.2700 workdays; section steel 105.0000 kg; welding electrodes 2.9300 kg; welding machine (general) 2.0620 machine-shifts; abrasive cut-off saw 500 mm 2.7070 machine-shifts; electric bender 0.0100 machine-shifts
C10-4-2 Installation, general pipe support Measuring, positioning, expansion bolts, assembling, fixing the support All-in labour class 2, 2.6460 workdays; welding electrodes 3.7830 kg; dry-mixed mortar 48.4120 kg; welding machine (general) 1.8050 machine-shifts

Key points: fabrication and installation are two independent items - overhead pipe supports must run 'fabrication plus installation' and never only one; the 105 kg of section steel per 100 kg already carries 5% wastage, the fabrication item is supplied-with-material, and no section-steel main material is added.

2. Timber-padded and spring supports take no separate item

Item note to C10-4-1 / C10-4-2 (the 2012 volume 10 note 3 identical): 'where pipe supports are timber-padded or spring type, run the corresponding pipe support fabrication and installation items; the anti-corrosion timber pads and spring vibration isolators are charged as main materials.' The support type never changes the item - only the main materials are added.

3. Cross-volume attribution: outdoor above-ground structural-steel supports go to the metal-structures volume, not the piping volume

Note 3 to C10-4-1 / C10-4-2: 'where outdoor pipes use above-ground structural-steel supports, run the corresponding items of appendix C.3, static equipment and process metal structures fabrication and installation.' (The 2012 volume 10 notes 2 and 3 the same: the support items apply to indoor pipe supports and supports inside outdoor pipe trenches... outdoor pipes on above-ground structural-steel supports run volume 3, Static Equipment and Process Metal Structures Fabrication and Installation.)

Hence the most common mis-application on overhead-laying works: indoor supports and supports in outdoor trenches -> piping-volume support items (C10-4-1 / C10-4-2); outdoor overhead above-ground structural-steel supports -> the static equipment and process metal structures volume (appendix C.3). Overhead pipe supports are above-ground structural steel frames (with independent foundations, columns and beams) - different materials and operations entirely; applying the piping-volume support item will be ruled a mis-application.

4. Group weight and the derusting / painting boundary

2012 volume 10 note 4: 'where a support group exceeds 50 kg, run the equipment support fabrication and installation items of this chapter.' Note 6: 'derusting and painting of pipe and equipment supports run the corresponding items of volume 12, Painting, Anti-corrosion and Insulation Works.' DB11/T 2382-2024 clause 6.10.4 the same: painting, anti-corrosion and insulation run the corresponding items of those works. (Both are legacy-volume notes - current projects must verify the same-position provisions of the current standard.)

Measurement rule (2012 rule 1): 'pipe and equipment support fabrication and installation is measured in kilograms by design mass; ready-made clamps by design quantity; equipment supports by group weight per the corresponding items.' Support quantity = sum over groups (design mass per group x group count) - never estimate off pipe length without checking the standard drawings.

5. Where support counts come from: spacing values are code data, not quota data

  • GB 50242-2002 clause 3.3.8: 'the spacing of supports and hangers for horizontal steel pipe shall not exceed table 3.3.8.' (Table 3.3.8, maximum spacing of steel pipe supports; the revision note: spacings for insulated pipes in the former clause 2.0.12 were relaxed by 0.5 m on survey and reference data.) - the ceiling for ordinary steel-pipe support spacing.
  • DB11/T 1832.14-2022 clause 2.0.19 (heating works, outdoor heat-supply network support fabrication and installation): (1) before laying directly buried heating pipe, fix the support positions, sketch them and record the measurements, then install the supports; (2) pipe in trenches is laid after the blinding, with levels re-checked and the trench centre line snapped; (3) overhead heating pipe supports use section steel, installed straight and firm; (4) between two expansion joints and on the far side of each joint of overhead, trench and buried heating pipe, anchor supports are set, their spacing per table 2.0.19-1; (5) anchor supports fixed firm and in tight contact with the pipe, the maximum allowable length to the free end (branches and risers included) per table 2.0.19-2; (6) a guide support between two anchor supports, keeping the pipe free to expand along the prescribed direction.
  • Group weights and forms (section-steel sizes, sliding / guiding / anchoring seat construction) are computed group by group from the design drawings or the standard support albums.

Conclusion: for overhead pipe, anchor-support counts come from dividing the expansion-joint intervals per the table 2.0.19-1 maximum spacings; guide supports sit between anchors; sliding and guiding supports are placed per the GB 50242-2002 table 3.3.8 ceilings - then weighed group by group off the albums into kg. The codes give spacing ceilings, never kilograms; taking quantities for the quota must return to the albums and the design.

6. The bill convention is the opposite - no double counting in the rate build-up

GB/T 50856-2024 clause 3.0.10: 'the work content of the equipment, pipe and accessory installation items of this standard includes the fabrication, installation and painting of supports, hangers and base section steel; where a special design requirement exists, list under the corresponding items of appendix N (other and ancillary works) or appendix M (painting, anti-corrosion and insulation works).'

So the all-in rate of a bill pipe item already carries support fabrication, installation and painting; with no special design requirement, no separate support bill item - while the quota must run the support items separately. No contradiction: the all-in rate is built from 'pipe item plus support item', but at bill level the support must not be listed again (doing so is double counting at settlement). Only with special design requirements (ready-made support sets, seismic supports) does appendix N (031301) list by kg or by set.

7. The railway volumes (the other side of the sector boundary)

TB/T 10832-2024 Railway Works Budget Quota, Volume 11 Water Supply and Drainage Works, chapter 3 section 3 (pipe foundations and supports), item 2, pipe support fabrication and installation; work content 'setting out, cutting, straightening, hot bending, drilling, welding'; items split by support type into fabrication and installation, per t:

Code Item
PY-365 Pipe support fabrication, general support
PY-366 Pipe support fabrication, timber-padded support
PY-367 Pipe support fabrication, spring support
PY-368 Pipe support installation, general support
PY-369 Pipe support installation, timber-padded support
PY-370 Pipe support installation, spring support

Three points when converting between the railway and Beijing structures: units (t versus 100 kg; 1 t = 10 x 100 kg); support types (the railway gives timber-padded and spring their own items, Beijing merges them into the general item by note with main materials added); base-price build-up (railway splits labour, material and machine costs; Beijing prices off labour, material and machine consumption). Railway works always use the TB volumes, never the municipal / installation volumes; cross-volume use is for cost comparison only.

Applicability boundaries

  • Items 1 to 4 take their numbers and notes from DB11/T 2382-2024 appendix C (C10-4-1 / C10-4-2); the over-50-kg equipment-support rule and the derusting / painting rule come from the Jing Jian Fa [2012] No. 538 volume 10 notes - current projects must verify against the same-position notes of the current standard before use.
  • 'Outdoor above-ground structural steel goes to the static equipment and process metal structures volume' applies only to outdoor above-ground structural steel; indoor supports and supports inside outdoor pipe trenches stay with the pipe support fabrication and installation items.
  • Seismic supports are outside this card: they are listed per set as ready-made support sets per GB 50981-2014 chapter 8, mutually exclusive with the kg convention here.
  • Spring vibration isolators, anti-corrosion timber pads and ready-made clamps are charged as main materials or by count, without consumption; support foundations (concrete, embeds) run the structures / building and decoration items.
  • Support spacings are code ceilings - actual layouts may run tighter but never over; take quantities from the design and the standard albums, never back-calculate a minimum off the ceilings to squeeze the price.
  • The railway and the municipal / installation volumes belong to different systems - different labour, material and machine settings and cost build-ups; never mix items or convert base prices by simple ratio.

Further reading

  • DB11/T 2382-2024, appendix C (general installation), table C.10.23-1 pipe support fabrication (C10-4-1 / C10-4-2, per 100 kg, with notes 1 to 3); appendix C.3 static equipment and process metal structures fabrication and installation; clause 6.10.4.
  • Jing Jian Fa [2012] No. 538, volume 10 (water, drainage, heating and gas), chapter 4: notes 1 to 10 and rules 1 to 6 (including 'support quantities may reference the pipe support weight tables in the appendix, or compute from the design via the standard fabrication and installation albums').
  • Jing Jian Fa [2021] No. 201, municipal works volume 4, pipe networks (part 2), chapter 9, note 2.
  • GB/T 50856-2024 Measurement Standard for General Installation Works: clause 3.0.10, appendix N (031301 other and ancillary works), appendix M (painting, anti-corrosion, insulation works).
  • GB 50242-2002 Code for Acceptance of Water Supply, Drainage and Heating Works: clause 3.3.8 and table 3.3.8.
  • DB11/T 1832.14-2022 Building Construction Craft Procedures, part 14, heating works: clause 2.0.19 and tables 2.0.19-1 (maximum anchor-support spacing) and 2.0.19-2 (maximum length from anchor to free end).
  • TB/T 10832-2024 Railway Works Budget Quota, Volume 11 Water Supply and Drainage Works, chapter 3 section 3, item 2, PY-365 to PY-370.