Composition and attribution of inspection and testing costs: ordinary verification inside overheads (already in the all-in unit rate), third-party and works quality-acceptance testing listed by the employer under other construction costs, failed retests of certified materials borne by the supplier
Inspection and testing cost is an overheads component - the contractor's ordinary verification and checking of the works, materials, members and installations per the standards (including own-laboratory consumables), already inside the all-in unit rate's fee build-up, never charged again; it excludes tests on new structures and materials, destructive member tests and special examinations, and testing commissioned by the employer - those are listed by the employer under other construction costs; where testing of materials holding conformity certificates fails, the testing cost falls on the supplying (contracting) party, and on the employer when they pass.
Applicable Codes
- 建筑安装工程费用定额 企业管理费 检验试验费条目(各省现行版本)
- GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9条、第3.6.4条
- GB/T 51095-2015 建设工程造价咨询规范
Positioning
Where 'inspection and testing cost' sits in the cost composition (an overheads sub-item) and how its bearing and listing are decided: which testing is already inside the contractor's all-in unit rate and never recharged, which the employer lists under other construction costs, and how retests split by pass or fail. For disputes over free-issue and contractor-supplied material testing, third-party testing and quality-acceptance testing.
Core conclusions
1. The quota definition (fee norms, overheads - inspection and testing, verbatim)
'Inspection and testing cost: the cost of the contractor's ordinary verification and checking of the works, materials, members and installations per the relevant standards, including consumables of its own laboratory. Excludes tests on new structures and new materials, destructive member tests and other special examinations, and testing commissioned by the employer - those are listed by the employer under other construction costs. But where testing of materials supplied by the contractor with conformity certificates fails, that testing cost is paid by the contractor.' Another edition is finer on third-party testing and the pass line: 'Inspection and testing excludes building-material testing and works quality-acceptance testing commissioned by the employer to third-party laboratories per the standards; the third-party cost is listed by the employer under other construction costs and paid per the commission'; 'testing of contractor-supplied materials holding conformity certificates - failing, the cost is the contractor's; passing, the employer's'.
2. Three-step attribution (usable directly in review opinions)
- Inside overheads, never recharged: ordinary verification and checking per the standards and routine own-laboratory tests (consumables included). Overheads are part of the all-in unit rate - no repeat charge in work items or other items.
- Into other construction costs, employer-listed: new-structure and new-material tests; destructive and special testing; testing commissioned by the employer; employer-commissioned third-party material and acceptance testing (paid per commission).
- Retests by 'who vouched / whose fault': testing certified materials - failing, the provider who issued the certificate pays; passing, the employer. I.e. 'certified yet failing -> supplier pays'.
3. The free-issue boundary
- Routine opening inspection, visual and specification checks and pre-installation checks of free-issue equipment and materials are the contractor's quality-management cost, inside the installation rate's overheads - no extra charge; employer-commissioned third-party testing or participation in acceptance runs in the employer's other construction costs, never duplicated in installation rates.
- Not to be confused with custody: free-issue coordination and custody services follow GB/T 50500-2024 clause 3.6.4 - ' borne by the employer, chargeable in the main contractor's attendance provisions'; inspection runs through overheads / other construction costs - the two channels never overlap.
Applicable boundaries
- Provincial (sectoral) fee norms word the sub-item differently, but 'inspection and testing = ordinary verification, third-party excluded' is uniform; follow the local fee composition notes and charging programme.
- Who bears third-party testing turns on who commissions: the employer -> other construction costs; the contractor's own routine checks -> no recharge. Express contract terms prevail.
- Commissioning and trial runs of equipment are outside inspection and testing - judge inclusion by the installation item's work content (some fire-alarm items already include own commissioning).
- Laboratory qualification, test items and sampling follow the testing administration rules; this card fixes only cost attribution.
Further reading
- Provincial (sectoral) fee norms, overheads - inspection and testing entries.
- GB/T 50500-2024 clauses 3.6.4 (free-issue coordination and custody in attendance provisions) and 2.0.9 (the all-in unit rate holds overheads).
- Quality-testing administration rules (commissioning and listing); the rebar-splice sampling card for worked attribution.
Keywords
- 检验试验费
- 第三方检测
- 工程建设其他费用
- overheads (company and site)
- 检测费用承担
- 材料复检
- 质量验收检测