Criteria for determining hollowness (debonding) of wall and floor tiles and rework cost calculation (demolition + re-laying quota line item pricing method)
First determine per acceptance criteria whether rework is mandatory: exterior wall face tiles shall have no hollowness or cracks (GB 50210-2018 Clause 10.3.5); interior fully-adhered face tiles shall have no hollowness on main faces and external corners, with only local edge/corner hollowness within 10 mm of the edge acceptable (Clause 10.2.4); floor tiles/stone allow local edge hollowness per tile and <=5% of the total count per natural room (T/CBDA 51-2021 Clause 18.3.8). Where rework is mandatory, price in two stages with "demolition quota line item + re-laying quota line item": demolition per renovation-work items (railway building quota norms FY-1050 floor tile removal, FY-1055 wall ceramic veneer chipping), re-laying per decoration-work items (FY-1215 floor tiles, FY-1393 wall tiles), with adjustment for price differentials applied to base-period prices and waste hauling counted separately; the cost outlet depends on responsibility (construction quality problems borne by the contractor; free-issue materials (by the employer)/design changes (designer-issued variation) claimable).
Applicable Codes
- GB 50210-2018 建筑装饰装修工程质量验收标准
- T/CBDA 51-2021 住宅装饰装修工程施工技术规程
- GB 50209-2010 建筑地面工程施工质量验收标准
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程
- TB 10801-2024 铁路基本建设工程设计概(预)算编制办法
- TB/T 10821-2024 铁路工程基本定额
Topic Positioning
The determination criteria and rework cost calculation for hollowness (debonding) of wall and floor tiles (face tiles, stone): when rework is mandatory, and how the rework cost is priced in two quota line item stages of "demolition + re-laying" (using the railway building quota norms as the example).
Core Conclusions
Determine first, price later. Criteria: exterior wall face tiles shall have no hollowness or cracks (GB 50210-2018 Clause 10.3.5); interior fully-adhered face tiles shall have no hollowness on main faces and external corners — only local edge hollowness within 10 mm of the edge is acceptable (Clause 10.2.4); floor tiles/stone allow local edge hollowness per tile, with hollowness <=5% of the total count per natural room (T/CBDA 51-2021 Clause 18.3.8, derived from GB 50209-2010 Clause 6.3.6); the inspection method is light tapping with a small hammer + observation. Edge hollowness within limits does not constitute rework; only out-of-limit positions are reworked. Rework cost = demolition cost + re-laying cost (labour + material + machinery) + waste hauling: demolition per renovation-work items (floor tile removal FY-1050, wall ceramic veneer chipping FY-1055), re-laying per decoration-work items (floor tiles FY-1215, wall tiles FY-1393, including 3%~4% material wastage); the quota base-period prices must be adjusted for price differentials per the published price information (government guidance prices) for labour/material at the preparation date (railway per the TB 10801-2024 compilation method); the demolition quota line item includes only stacking within 30 m, waste hauled separately. Cost outlet: construction quality problems are borne by the construction unit without separate measurement; free-issue materials (by the employer) quality or design changes (designer-issued variation) are charged via vouchers/claims.
Applicable Boundaries
The pricing caliber is based on the railway building quota norms (TB/T 10831-2024 Volume 10) renovation and decoration chapters; other regions/industries substitute their own quota line items — the method is general; base-period prices are not market prices and must be adjusted for price differentials in actual pricing; thin-bed (adhesive) methods differ from the quota mortar-adhered method and are adjusted per the actual process; demolished tiles have high breakage rates and are generally counted as new tiles (the quota norms already include wastage).
Further Reading
GB 50210-2018 Clauses 10.2.4, 10.3.5; T/CBDA 51-2021 Clause 18.3.8; GB 50209-2010 Clause 6.3.6; TB/T 10831-2024 Volume 10 Building Works, Chapter 1 Section 9 renovation works (FY-1050~FY-1058 demolition and chipping) and the decoration works section (FY-1215 floor tiles, FY-1393 wall tiles); for price adjustment (for fluctuation) see the TB 10801-2024 compilation method; for material wastage rates see the appendix of TB/T 10821-2024 basic quota norms.
Keywords
- 空鼓
- 返工
- 墙地砖
- 饰面砖
- 返工费用
- 拆除定额
- 铁路房屋定额
- 验收标准