Version management and responsibility tracing for AI-generated engineering deliverables: obsolete-document disposal, version state machine, and the statutory signature chain

Version management governs status, not content: document changes must be re-reviewed and re-approved with the current revision status identifiable; when a new version is issued, obsolete documents are simultaneously disposed of (marked or isolated to prevent misuse); recommended state machine V0 draft -> V1 for review -> V2 approved (current) -> V3 obsolete, overwriting strictly forbidden, version ledger kept. Responsibility tracing relies on the statutory signature chain: three-level management with two-level review (compile-review-approve), registered cost engineers sign, seal, and bear responsibility, and final deliverables are reviewed, signed, and sealed by a first-class registered cost engineer; AI tools are recorded as "applications" in metadata — AI cannot replace human signature and responsibility.

Applicable Codes

  • GB/T 50380-2006 工程建设设计企业质量管理规范
  • GB/T 51095-2015 建设工程造价咨询规范
  • 住建部令第50号 注册造价工程师管理办法(2020修正)
  • CJJ/T 117-2017 建设电子文件与电子档案管理规范
  • CJJ/T 158-2011 城建档案业务管理规范
  • DB35/T 2081-2022 工程建设项目电子文件归档一体化管理技术要求

Topic Positioning

A compliance framework for version management and responsibility tracing of AI-generated engineering deliverables (calculation books, cost-consultancy deliverables, design schemes, etc.), solving two problems: "misuse of old versions" and "unclear responsibility".

Core Conclusions

Version management governs "status", not "content": (1) after a document changes it must be reviewed and approved again, ensuring changes and the current revision status are identifiable; (2) when issuing a new version, simultaneously dispose of obsolete documents; obsolete documents that must be retained should be marked or isolated to prevent misuse (GB/T 50380-2006, Clause 6.0.3; T/CBDA 75-2024, Clause 5.3.9). Implementation recommendation: a state machine of V0.x draft -> V1.0 for review -> V2.0 approved (current) -> V3.0 obsolete; overwriting the same document is strictly forbidden; the ledger records version no. | date | change summary | changer | reviewer; for partial drawing changes the drawing number stays unchanged with only a change record, while a full reissue uses a suffix version (a/b/c). Responsibility tracing relies on the statutory signature chain: cost-consultancy deliverables are compiled by the compiler and reviewed at two levels by reviewer and approver (GB/T 51095-2015, Clause 3.3.2), with seals on the cover (inner cover) and signature page, signature page and summary table, and names on detail tables (Clause 3.3.6); registered cost engineers sign and seal the deliverables they produce and bear legal responsibility, and final deliverables are reviewed, signed, and sealed by a first-class registered cost engineer (MOHURD Order No. 50, Article 18). Electronic documents must capture metadata (creator, time, application and its version — AI tool name and version recorded as well); authenticity, integrity, and validity are assured by identity recognition, operation logs, and electronic seals/digital signatures (CJJ/T 117-2017, Clause 5.3.1; CJJ/T 158-2011, Clause 11.1.5); archive information packages are tamper-proof with logs retained (DB35/T 2081-2022, Clause 6.3.6).

Applicable Boundaries

Applies to general document control and signature scenarios of construction engineering deliverables (cost consultancy, design, construction schemes, etc.); the version state machine is a recommended implementation that can be refined per enterprise document-management procedures; the AI scenario only adds "tool trace" records without changing statutory signatures and responsibility attribution; it does not cover IP ownership of AI output.

Further Reading

GB/T 50380-2006 Clause 6.0.3 document management; GB/T 51095-2015 Clauses 3.3.2, 3.3.6 signature and review system; MOHURD Order No. 50 (2020 amendment) Article 18; CJJ/T 117-2017 Clause 5.3.1; CJJ/T 158-2011 Clause 11.1.5; DB35/T 2081-2022 Clause 6.3.6.

Keywords

  • 版本管理
  • 责任留痕
  • 文件控制
  • 作废文件
  • 签署
  • 执业印章
  • 电子文件归档
  • AI生成成果文件