non-competitive (statutory fees not subject to competition)
- 01
Content and pricing methods of preliminaries: the 2024 definition (clause 2.0.3), the listing basis (GB/T 50854-2024 annex R table R.1.1 preliminary items, code 011601), the three pricing methods of unit rate / lump sum / percentage rate and their preferred use (clauses 2.0.10 to 2.0.12, 3.2.1), the completion rules of annex E tables E.3.1 to E.3.4, and the non-competitive rule for statutory safety provisions (clause 3.2.5)
Preliminaries are 'project costs incurred in taking the relevant measure…
GB/T 50500-2024 第 2.0.3 条(措施项目术语)GB/T 50500-2024 第 2.0.10~2.0.12 条(单价计价/总价计价/费率计价)GB/T 50500-2024 第 3.2.1 条(措施项目清单计价方式)2026-11-01 - 02
Preliminaries bid at zero - can an increase be claimed at final account? (principle-plus-exception framework, with clarification of Clause 10.3.3)
Ordinary preliminaries bid at zero constitute a lump-sum price and are n…
GB/T 50500-2024 建设工程工程量清单计价标准(第3.2.5、3.3.7、6.1.5、6.2.3、6.2.6、7.3.1、7.4.4、10.3.3条)TB 10801-2024(铁路口径安全生产费,第3.11.11条)2026-09-25 - 03
Work safety levy for non-railway works (building / municipal / highway / water conservancy): accrual basis, non-competitive nature, and ring-fenced use rules
Building/municipal: the mandatory health, safety and environmental (HSE)…
JTG 3830-2018 公路工程建设项目概算预算编制办法GB/T 50500-2024 建设工程工程量清单计价标准GB 50722-2011 城市轨道交通建设项目管理规范2026-09-25 - 04
GB 50500-2013 -> GB/T 50500-2024: changes to the clauses on statutory levies and fees, taxes and the mandatory health, safety and environmental (HSE) provisions — mandatory provisions withdrawn, the bills restructured into four parts, and the item renamed statutory safety provisions
2013 Clause 3.1.6, “statutory levies and fees and taxes must be calculat…
GB 50500-2013 第3.1.5、3.1.6条(强制性条文)GB/T 50500-2024 第3.1.2、3.2.5、3.2.11、2.0.9、3.1.6条建办〔2005〕89号《建筑工程安全防护、文明施工措施费及使用管理规定》2026-09-25