temporary works and site establishment costs
- 01
Within preliminaries: the composition, charging method and calculation bases of mandatory HSE provisions (statutory safety provisions), temporary works and site establishment costs, and the additional cost of night work, compared; plus the clause basis of the non-competitive status of mandatory HSE provisions and the item listing rules
Mandatory HSE provisions comprise four heads - environmental protection…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.4条、第3.2.5条GB 50722-2011 城市轨道交通建设项目管理规范 第5.2.9条GB/T 50875-2013 工程造价术语标准 第2.2.52条、第2.2.53条2026-10-25 - 02
Cost attribution and estimation of temporary hoarding, gates, and wheel-wash facilities on site (basis of mandatory health, safety and environmental (HSE) provisions)
Hoarding, gates, and wheel-wash facilities belong respectively to the si…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法TB 10811-2024 铁路基本建设工程设计概(预)算费用定额DB64 680-2018 建筑工程安全管理规程2026-09-25 - 03
Sizing and cost estimating of project temporary works: the three-way split of minor temporary works / heavy temporary works / employer's temporary works, plus the headcount-index method, capacity back-calculation, and itemized listing
First split temporary works by cost category: minor temporary works are…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法TB 10811-2024 铁路基本建设工程设计概(预)算费用定额GB 51114-2015 露天煤矿施工组织设计规范2026-09-25 - 04
Pooling and allocating temporary works costs of office/living/production zones: externally merged into preliminaries percentage rates, internally allocated by drivers
External pricing does not "allocate": office, living and small productio…
TB 10801-2024 第3.6节、第3.8节TB 10811-2024 第2.8节SJG 86-2020 第4.4.2条2026-09-25