Pooling and allocating temporary works costs of office/living/production zones: externally merged into preliminaries percentage rates, internally allocated by drivers
External pricing does not "allocate": office, living and small production temporary works merge into small temporary works and are charged in bulk with the preliminaries at (base-period labour cost + base-period plant and small tools cost) x percentage rate; production facilities meeting the large temporary works standard are priced separately as incurred. Allocation only arises in internal cost accounting: direct costs charged directly, shared on-costs (indirect costs) allocated by drivers such as labour cost/output value/headcount x duration/area occupied, with the sum of allocations = total cost.
Applicable Codes
- TB 10801-2024 第3.6节、第3.8节
- TB 10811-2024 第2.8节
- SJG 86-2020 第4.4.2条
- 《企业会计准则》第四十八条
- 《企业财务通则》第二十六条
Topic Positioning
Pooling and allocation of temporary works costs of the site office, living and production zones (three zones): distinguishing the external estimate/budget pricing basis from the internal cost-accounting basis.
Core Conclusions
External pricing basically does not "allocate": office, living and small production temporary works (rebar canopies, material stores, small mixing points, etc.) merge into small temporary works and are charged in bulk with the preliminaries at (base-period labour cost + base-period plant and small tools cost) x percentage rate (TB 10801-2024 Clauses 3.6.2~3.6.4, percentage rates per TB 10811), not billed as a separate item or split; production facilities meeting the large temporary works standard (centralized mixing stations, girder fabrication/storage yards, sleeper/segment precast yards, track-laying bases, etc.) are established separately as large temporary works, priced by applying quota items through the single-item estimate (budget) procedure (TB 10801-2024, Section 3.8; TB 10811-2024, Clause 2.8.1) and booked into Chapter 10 of the composite estimate; employer temporary works and site establishment costs are estimated from actual quantities, or at about 1% of works costs when inconvenient to estimate (SJG 86-2020, Clause 4.4.2). Allocation arises only in internal cost accounting: per Accounting Standards for Business Enterprises Article 48 and General Rules of Enterprise Finance Article 26, temporary works used solely by one cost object are charged directly; shared parts are allocated by the driver most correlated with the cost — office/living zones by labour cost (work-days) proportion, production facilities by output value/quantity (e.g., concrete volume), living zones refined to headcount x duration, yard hardening and utilities by occupied area; allocation drivers are fixed before commencement and amortized monthly, with the check that the sum of allocations across objects = total temporary works cost.
Applicable Boundaries
The external pricing part follows the railway estimates and budgets (China Railway system) basis as the main line (small temporary works merged into the preliminaries, large temporary works priced separately); building/municipal works follow their own mandatory health, safety and environmental (HSE) provisions or temporary works and site establishment cost percentage-rate systems — the percentage rates are lump-sum in nature and non-competitive, and must not be split or adjusted by zone; internal allocation is a general accounting framework, with specific drivers per the project's cost-object division.
Further Reading
See "Measures for compiling design estimates (budgets) of railway capital construction projects" TB 10801-2024 Section 3.6 (preliminaries and small temporary works content), Section 3.8 (large temporary works items and cost content); "Norms for on-costs and expenses for design estimates (budgets) of railway capital construction projects" TB 10811-2024 Section 2.8 (large temporary works calculation, borrowed materials and maintenance quota norms); "Rules for compiling building and municipal estimates" SJG 86-2020 Clause 4.4.2; cost allocation per Accounting Standards for Business Enterprises Article 48 and General Rules of Enterprise Finance Article 26.