Cost attribution and estimation of temporary hoarding, gates, and wheel-wash facilities on site (basis of mandatory health, safety and environmental (HSE) provisions)

Hoarding, gates, and wheel-wash facilities belong respectively to the site housekeeping and appearance fee, the temporary works and site establishment costs / site monitoring fee, and the dust pollution prevention fee sub-items of mandatory health, safety and environmental (HSE) provisions (a Chinese non-competitive fee; the literal loan translation is misleading, so an institutional note is required); in regions with lump-sum percentage rates they must not be listed separately again; in regions where costs are itemised on an actual basis, estimate by "quantity × unit price" applying quota items + equipment price enquiries; on the railway basis this corresponds to the statutory work safety levy (earmarked funds) + preliminaries, with minor temporary works cost included in preliminaries and heavy temporary works priced by applying quota items on an actual basis.

Applicable Codes

  • TB 10801-2024 铁路基本建设工程设计概(预)算编制办法
  • TB 10811-2024 铁路基本建设工程设计概(预)算费用定额
  • DB64 680-2018 建筑工程安全管理规程
  • SJG 86-2020 建筑和市政工程估算编制规程
  • GB 51114-2015 露天煤矿施工组织设计规范

Topic Positioning

Cost attribution and estimation of three common temporary works within mandatory health, safety and environmental (HSE) provisions — site hoarding, gates (incl. access control), and vehicle wheel-wash facilities — answering "which fee, how to estimate, and when double charging arises".

Core Conclusions

All three belong to the mandatory health, safety and environmental (HSE) provisions system: hoarding goes to the site housekeeping and appearance fee (site enclosure); vehicle washing at exits, sedimentation tanks, and dust-suppression facilities go to the dust pollution prevention fee; smart access-control attendance systems go to the site monitoring fee; gate bodies and foundations may go, per local quota norms (prescribed resource consumption standards), to the site housekeeping and appearance fee (corporate identity, site appearance) or to temporary works and site establishment costs. One of two estimation bases: (1) regions with lump-sum percentage rates — the percentage rate already includes the above, and no separate or double listing is allowed; (2) regions where costs are itemised on an actual basis — "quantity × unit price": hoarding = site perimeter − gate width × quota norm/market unit price (turnover-type facilities by amortisation or rental); wheel-wash facilities = civil works (wash platform, sedimentation tank, drainage ditches per quota norms) + equipment (wash machines, high-pressure water jets by market price enquiry) as two amounts. Railway basis: corresponds to the statutory work safety levy (earmarked funds) (construction and installation works cost × percentage rate, limited to the ten spending categories of TB 10801-2024 Table 3.11.11, and not double-listable elsewhere); site housekeeping and construction environmental protection fees are merged into preliminaries = (base-period labour cost + base-period machinery and tools use cost) × percentage rate; minor temporary works cost is likewise included in preliminaries, while heavy temporary works are priced by applying quota items in accordance with the project execution plan (construction methodology and site organization) and calculated on an actual basis (TB 10811-2024 Section 2.8).

Applicable Boundaries

Applies to estimating site temporary-works costs in building, municipal, railway, etc.; whether percentage-rate lump-sum applies follows the percentage rate composition of the current local norms for on-costs and expenses — check the composition first, then decide on separate listing. Employer temporary works and site establishment costs (about 1% of works costs for new projects when actual-cost estimation is inconvenient) and contractor mandatory health, safety and environmental (HSE) provisions are two separate bases and must not be mixed. This card excludes regional quota line item prices and percentage rate values — look them up in the current local quota norms.

Further Reading

Fee composition definitions: DB64 680-2018 "Regulations for Construction Safety Management" Clauses 2.6, 5.16.2; railway basis: TB 10801-2024 Section 3.6 (preliminaries), 3.8 (heavy temporary works), Table 3.11.11 (statutory work safety levy (earmarked funds)), TB 10811-2024 Section 2.8 (calculation of heavy temporary works and quota norms for diversion line/access road maintenance); employer temporary works: SJG 86-2020 Clause 4.4.2; temporary-works sizing indicators: GB 51114-2015 Clauses 6.3.7, 6.3.8.