winter (cold-weather) works
- 01
The charging base of the winter and rainy season construction addition (norm labour, or labour plus plant), deciding the winter construction season, rate-based lump-sum charging versus special measures (warm-shed method, steam curing) priced on approved schemes and records, and the no-double-count rule against the night-work addition
Under the building and municipal basis the winter / rainy season additio…
JGJ/T 104-2011 · Specification for Winter Construction of Building Engineering 第1.0.3条GB/T 50875-2013 · Standard glossary of project costs 第2.2.55条GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第3.3.7条、Ch. 82026-10-28 - 02
Winter concreting: mixer-discharge and placing temperatures and critical strength against freezing (GB 50666-2011, JGJ/T 104-2011, DB11/T 1832.3-2021)
In winter, the mixer-discharge temperature of concrete should not be bel…
GB 50666-2011 混凝土结构工程施工规范 第10.2.7、10.2.12条JGJ/T 104-2011 建筑工程冬期施工规程(备案号 J 1189-2011)第6.1.1、6.2.6条、App. ADB11/T 1832.3-2021 建筑工程施工工艺规程 第3部分:混凝土结构工程 第34.4.6、34.4.14条2026-09-25 - 03
Division of bases for winter construction: definition per JGJ/T 104-2011, cost measurement per the pricing system (highway JTG 3830-2018 / building-municipal Jian Biao [2013] No. 44)
JGJ/T 104-2011 remains in force (record no. J 1189-2011); Article 1.0.3…
JGJ/T 104-2011 建筑工程冬期施工规程JTG 3830-2018 公路工程建设项目概算预算编制办法GB/T 50875-2013 工程造价术语标准2026-09-25 - 04
Definition of winter construction and calculation of the winter construction cost increment
Winter construction begins when the outdoor daily mean temperature stays…
JGJ 104-97 建筑工程冬期施工规程GB/T 50875-2013 工程造价术语标准TB 10811-2024 铁路基本建设工程设计概(预)算费用定额2026-09-25