pile head cropping
- 01
Pricing basis and settlement recognition rules for the over-concreting (additional pour) length of bored piles (comparison of values across quota and consumption standards)
Priced quantity of bored pile concrete = design pile cross-sectional are…
TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works) 册说明TB/T 10823-2024 · Budget Quota of Railway Engineering (Volume 2: Bridge and Culvert Works) 册说明SJG 111.1-2022 · Consumption Standard for Urban Utility Tunnel Works (Shenzhen) 3.2.22026-10-03 - 02
The "length" value for pile-head cutting/chiseling quantities and comparison of measurement calibers across quota systems (40d, over-cast height, by count)
The "length" of pile-head cutting/chiseling means the height to be cut/c…
TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程(册说明十七、十八,FY-185~FY-189)TB/T 10823-2024 铁路工程预算定额 Vol. 2 桥涵工程(册说明十、十一,QY-229~231)DB11/T 2382-2024 建设工程施工消耗量标准(App. A.3.4 凿桩头)2026-09-25 - 03
Pile foundation pricing: general rules on whether empty bore, rock socketing, slurry, reinforcement cages, and pile head trimming are priced separately
Empty bore is not listed separately: boring is measured over the full ho…
GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准GB/T 50861-2024 城市轨道交通工程工程量计算标准SJG 111.1-2022 城市地下综合管廊工程消耗量标准2026-09-25 - 04
Pile-cutting machine operation clarified: is the jet-grouting pile-head cutter a ring cutter? Codes require only dedicated equipment, not a machine type
Railway acceptance standards require only "pile heads shall be cut by pi…
TB 10414-2018 铁路路基工程施工质量验收标准TB 10751-2018 高速铁路路基工程施工质量验收标准TB 10106-2023 铁路工程地基处理技术规程2026-09-25 - 05
Cross-sector comparison of pile-head removal measurement and pricing: railway per pile or m3; highways embedded in the pile-concrete item; municipal/rail-transit per broken volume m3; BOQ layer folded into pile-item work contents
Whether head removal is a separate item and its unit is the biggest cros…
TB/T 10823-2024 铁路工程预算定额 Vol. 2 桥涵工程TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程JTG/T 3832-2018 公路工程预算定额2026-09-04 - 06
Measuring and pricing pile-head removal (cropping) in the railway 2024 quotas: bridge volume by diameter tier per pile (QY-229~231), buildings volume by 40d/over-grout height (FY-185~189)
Two regimes in the 2024 railway quotas: bridges (TB/T 10823-2024 Vol.2)…
TB/T 10823-2024 铁路工程预算定额 Vol. 2 桥涵工程TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程2026-09-04