profit
- 01
Reading the all-in unit rate pricing schedule of the fee quota norms line by line: charging bases (labour cost / labour cost plus plant and small tools cost), the order of charging (overheads, profit, risk cost -> all-in unit rate; pre-tax project cost -> VAT -> unit works cost), and a comparison of provincial bases (Shaanxi 2025 tables 5-1/5-2/5-3; Hubei 2024) with sector bases (highway form 08; railway table 2.6.2)
The main line of the all-in unit rate pricing program: labour, materials…
陕西省建设工程费用规则(2025版)表5-1、表5-2、表5-3湖北省建筑安装工程费用定额(2024)二、计算程序 及 附件4JTG 3830-2018 公路工程建设项目概算预算编制办法(08表填表说明)2026-10-25 - 02
Determining overheads (company and site) and profit within the all-in unit rate: the dual track of the percentage-rate method and independent market-level measurement (including railway on-costs percentage rates)
Overheads (company and site) and profit are determined on the dual track…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9条、第6.1.3条GB/T 51095-2015 建设工程造价咨询规范 第5.3.9条TB 10811-2024 铁路基本建设工程设计概(预)算费用定额 第2.9.1条及Table 2.9.12026-10-18 - 03
Setting overheads and profit in repricing variations and other price adjustments (GB/T 50500-2024 Articles 3.6.6, 8.4.6, 8.8.5, 8.9.1)
On repricing (no identical or similar rates), GB/T 50500-2024 Article 8…
GB/T 50500-2024 第3.3.5条、第3.6.6条、第8.4.6条、第8.6.3条、第8.8.5条、第8.9.1~8.9.3条T/ZBD 100.4-2023 第4.6.2条GB/T 50319-2013 第6.3.3条2026-10-12 - 04
Highway 2018 quota system profit: base = quota direct costs + measures + enterprise management, rate 7.42% (JTG 3830-2018 clause 3.1.9)
Per clause 3.1.9 of JTG 3830-2018 "Measures for compiling estimates and…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第 3.1.9 条、第 3.1.10 条2026-09-25