ongoing (dynamic) cost management
- 01
Procedure for synchronously adjusting the responsibility-centre cost after a major change to the project execution plan (construction methodology and site organization) (trigger conditions → re-approval of the revised scheme → cost re-estimation → revision report → re-issue)
A scheme change does not automatically adjust the responsibility-centre…
GB/T 50502-2009 第3.0.6条GB 55032-2022 第3.1.4条GB/T 50358-2017 第7.2.4条2026-09-25 - 02
Project execution plan and construction method statements - life-cycle overview: classification, preparation, approval, implementation, dynamic management and changes
Execution plans divide into three tiers by object (overall project execu…
GB/T 50502-2009 建筑施工组织设计规范(第3.0.1、3.0.5、3.0.6条)GB 55032-2022 建筑与市政工程施工质量控制通用规范(第3.1.4条,全文强制)住建部令第37号(第47号令修正)危险性较大的分部分项工程安全管理规定(第十至十三条)2026-09-25 - 03
Graded handling of whether a construction method statement may remain in use after a design change: briefing-only revision / revision and re-approval / re-compilation and re-verification by the expert panel for sub-divisional works involving significant hazards
One judgment criterion: whether the technical premises of the original s…
GB/T 50502-2009 建筑施工组织设计规范GB 55032-2022 建筑与市政工程施工质量控制通用规范T/XCIA 3-2023 危险性较大的分部分项工程施工安全管理规程2026-09-25 - 04
Re-approval of construction schemes after construction-condition changes: ordinary schemes re-follow the procedure under the original authority; major adjustments of dangerous sub-part special schemes require re-demonstration
Construction schemes are under dynamic management; upon major changes of…
DB11/T 1745-2020 建筑工程施工技术管理规程DB37/T 5164-2020 建筑施工现场管理标准T/XCIA 3-2023 危险性较大的分部分项工程施工安全管理规程2026-09-25