minor temporary works cost
- 01
Railway estimate/budget haul-road cost classification: the dividing standard between heavy temporary works and minor temporary works (preliminaries) (TB 10801-2024 Clause 3.6.2 vs. Clause 3.8.3)
Whether a railway temporary haul road is charged to heavy temporary work…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第3.6.2条、第3.6.3条、第3.8.3条、第3.8.4条、第3.8.7条、App. ATB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works2026-09-25 - 02
Lease vs. self-build economics for the construction camp (temporary works): the break-even duration method (external pricing unchanged)
Decide with the break-even duration T* = (self-build net cost - lease co…
TB 10801-2024TB 10811-2024GB 51114-20152026-09-25 - 03
Railway estimate/budget preliminaries and on-costs (indirect costs): composition, calculation base, and percentage rates (TB 10801-2024 Clauses 3.6/3.9; TB 10811-2024 Table 2.9.1)
Preliminaries (7 items: winter (cold-weather) and rainy-season construct…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第2.6、3.6、3.9条TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works 第2.9节Table 2.9.12026-09-25 - 04
Attribution of demolition and restoration costs of temporary works: contractor minor/heavy temporary works included in preliminaries, employer's temporary works excluded (demolition cleanup belongs to site preparation costs)
The contractor's temporary works demolition and restoration costs are al…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法TB 10811-2024 铁路基本建设工程设计概(预)算费用定额SJG 86-2020 建筑和市政工程估算编制规程2026-09-25