Four-axis distinction among variations, additional works, dayworks and claims under GB/T 50500-2024 (triggering events / procedure / time limits / pricing basis) and the fallback positioning of claims
GB/T 50500-2024 clause 8.1.1 lists contract price adjustment matters in…
GB/T 50500-2024 建设工程工程量清单计价标准 Ch. 2 术语 2.0.16、2.0.28、2.0.30GB/T 50500-2024 Ch. 7 合同工程计量 7.4.1、7.5.1、7.5.2、7.5.5、7.6.1GB/T 50500-2024 Ch. 8 合同价款调整 8.1.1、8.6.2、8.9.1、8.9.2、8.9.6、8.9.8、8.10.1、8.10.2、8.10.3、8.11.1、8.11.3、8.11.5、8.11.7、8.11.9、8.11.102026-11-01 - 02
Price adjustment for quantity increases caused by the contractor's construction-stage design development under an EPC lump-sum contract: no adjustment in principle; adjustment only where the difference constitutes an employer-required variation or arises from employer causes
No adjustment in principle; adjustment only by exception. Where the cont…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.25条、第1.0.2条、第3.3.1~3.3.3条、第3.3.9条、第8.2.3条、第8.10.1条T/ZBD 100.4-2023 建设工程造价鉴定作业指引 第4.4.6条、第4.6节建市〔2020〕96号 建设项目工程总承包合同(示范文本)GF-2020-0216 通用合同条件 第5.1.3款、第5.2.1款、第5.6款、第13.1.1款、第13.3.3款2026-10-29 - 03
Boundary determination and clause routing among quantity deviation, variation and omitted BOQ items: sections 9.4/9.5/9.6 of the 2013 edition are merged into 'BOQ errors' in GB/T 50500-2024, sorted by three comparison tests (contract drawings vs contract BOQ; contract drawings vs actual construction drawings; inside vs outside the contract works scope), with an anti-double-counting rule that one matter goes through one route only
The routing test is unique: a difference between the contract drawings (…
GB/T 50500-2024 第2.0.27条(工程量清单缺陷)GB/T 50500-2024 第2.0.28条(工程变更)GB/T 50500-2024 第2.0.30条(新增工程)2026-10-25 - 04
Identifying and pricing additional works from the settlement-review and construction cost expert assessment perspective: supplementary agreements first, no supplementary agreement does not automatically bind the original contract's pricing principles, rate build-up classified by the original pricing method, and the burden of proof (T/ZBD 100.5-2023 clause 3.1.10; T/ZBD 100.4-2023 clause 4.8.3)
Per T/ZBD 100.5-2023 clause 3.1.10 and T/ZBD 100.4-2023 clause 4.8.3: wo…
T/ZBD 100.5-2023 第3.1.10条T/ZBD 100.4-2023 第4.8.3条GB/T 50500-2024 第8.10节2026-10-18 - 05
Pricing channels for works outside the contract scope and unforeseen works: recognising and pricing additional works, when dayworks apply, and the rules for using provisional sums
Where the contractor, at the employer's request, completes additional wo…
GB/T 50500-2024 建设工程工程量清单计价标准 第8.10.1条GB/T 50500-2024 第7.5.2条GB/T 50500-2024 第8.3.2条2026-09-26 - 06
Adjustment of the contract price (GB/T 50500-2024 Chapter 8): eleven triggering events, mechanism by section, and FIDIC mapping
Adjustment of the contract price is the mechanism for changing the contr…
GB/T 50500-2024 建设工程工程量清单计价标准(第8.1.1/8.1.2条、第8.2~8.11节、第7.5节、App. A、App. G)FIDIC Red/Yellow Book 2017(第13.3、13.4、13.6、13.7、20.2.1 条〔对照〕)GB/T 50875-2013 工程造价术语标准2026-09-25 - 07
GB/T 50500-2024 abolishes site instructions (xianchang qianzheng): out-of-contract work now goes through variations / new works / dayworks, and statutory time limits become contractual
GB/T 50500-2024 deletes the 2013 Section 9.14 "site instructions" with i…
GB/T 50500-2024 建设工程工程量清单计价标准(第2.0.16/2.0.28/2.0.30条、第7.5节、第8.1.1条、第8.6节、第8.9节、第8.10节)GB/T 50875-2013 工程造价术语标准(第3.4.8条 现场签证)GB 50500-2013 建设工程工程量清单计价规范(第9.14节,已废止,对照)2026-09-25 - 08
FIDIC Red Book 2017 Variations vs China's variation/new-works regime (13.1 vs GB/T 50500-2024 2.0.28/2.0.30, 8.1.1 and T/ZBD 100.4-2023 4.6.1)
The two share one origin and structure: GB/T 50500-2024 term 2.0.28 "var…
FIDIC《施工合同条件》(红皮书)2017 年第 2 版 Sub-Clause 13.1 (Variations)GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 术语 2.0.28/2.0.30、第 8.1.1 条T/ZBD 100.4-2023 · Work Guideline for Construction Cost Appraisal 第 4.6.1 条2026-09-25