plant and small tools cost
- 01
Pricing-form determination and machine-shift rate value for site-owned diesel generator sets: own units by machine-shift (TB/T 10814-2024 power machinery items 9101243/9101253 plus Appendix A base data), leased units by certified rent, standby non-running units by idle cost (depreciation plus labour plus others), and the boundary against permanent-equipment procurement and installation (TB/T 10833-2024 JY-260 to JY-267)
One generator set takes exactly one pricing channel: (1) own units enter…
TB/T 10814-2024 · Quota for Shift Costs of Construction Machinery and Tools of Railway Engineering Ch. 1总则 1.0.3~1.0.5、Ch. 2第二节动力机械(9101231~9101271)、App. A 施工机械基础数据表TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第3.3节 施工机具使用费(3.3.1~3.3.6)TB 10833-2024《铁路工程预算定额 第十二册 机务车辆机械工程》第一章第七节 柴油发电机组 JY-260~JY-2672026-11-12 - 02
Determining plant and small tools cost within the all-in unit rate: consumption × plant rate per machine-shift, 7-item/4-item composition of the plant rate per machine-shift, and adjustment for price differentials
Plant and small tools cost = construction machinery usage cost + constru…
TB/T 10814-2024 · Quota for Shift Costs of Construction Machinery and Tools of Railway Engineering 第1.0.1~1.0.6条及App. A/B/CTB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第3.3节、第4.1.2条TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works 第2.3节2026-10-25 - 03
Identifying anomalous data in machine-shift records: a four-layer verification method (field checks -> quantity cross-footing -> unit pricing -> aggregate statistics)
Machine-shift record anomalies concentrate in four types: fabricated shi…
TB/T 10814-2024 铁路工程施工机具台班费用定额TB 10801-2024 铁路基本建设工程设计概(预)算编制办法GB/T 50500-2024 建设工程工程量清单计价标准2026-09-25 - 04
Railway 2024 quota plant rate per machine-shift composition: Class 1 (fixed) vs Class 2 (variable) cost division and price adjustment rules (TB 10801-2024 clauses 3.3/4.1.2; TB 10811-2024 clause 2.3)
Under the railway 2024 quota system, of the seven components of the cons…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第3.3节、第4.1.2条TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works 第2.3节TB/T 10814-2024 · Quota for Shift Costs of Construction Machinery and Tools of Railway Engineering2026-09-25