composition of project costs
- 01
Definitions, cost composition and applicable conventions of the direct-cost rate, the all-in unit rate and the fully loaded all-in rate compared (Order No. 107 of the Ministry of Construction, GB/T 50500-2024, GB/T 51095-2015, etc.)
The three rate conventions widen in scope in turn: the direct-cost rate…
《建筑工程施工发包与承包计价管理办法》(建设部令第107号)第五条《建筑工程施工发包与承包计价管理办法》(住房和城乡建设部令第16号,2014年施行;建设部令第107号的现行替代版本)GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.9条、第3.1.6条、第3.1.7条2026-09-25 - 02
Maximum bid price (former tender price ceiling) compilation framework and cost composition under GB/T 50500-2024
State-funded projects must set a maximum bid price (the former tender pr…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50500-2013 建设工程工程量清单计价规范招标投标法实施条例 第27条2026-09-25 - 03
Three-dimensional cost analysis method for billed (BOQ) items: quantity, price, and fee (quantity recheck → price reasonableness → fee composition)
Split the cost of a single billed (BOQ) item into three independent dime…
GB/T 51095-2015 建设工程造价咨询规范GB/T 50500-2024 建设工程工程量清单计价标准TB 10801-20242026-09-25 - 04
GB/T 50500-2024 vs GB 50500-2013 edition change: all-in unit rate composition changes and the repositioning of statutory levies and fees and taxes and duties in the BOQ-based pricing system
The 2024 edition removes "statutory levies and fees" entirely from the B…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works (住房城乡建设部公告 2024 年第 212 号,2025-09-01 实施)GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works (已废止)2026-09-25