Appendix A
- 01
Selecting between the two methods of contract price adjustment for changes in costs: comparison of applicable conditions, clause-by-clause contrast and same-contract mixing boundaries of the Appendix A.1 index-based adjustment and the Appendix A.2 adjustment based on published price information under GB/T 50500-2024
The two methods share an identical adjustable scope, base time point and…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 3.3.5 条GB/T 50500-2024 第 8.7.1 条GB/T 50500-2024 第 8.7.2 条2026-10-25 - 02
Railway general estimate (budget) chapter table, Chapters 1-11: chapter order, section numbers and detailed cost contents per chapter (TB 10801-2024 Appendix A)
Per Appendix A 'General estimate (budget) chapter table' of TB 10801-202…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法:第 2.5 节、第 2.3.3 条、第 3.8 节、第 3.11 条、App. A Table A.0.1、App. B Table B.0.152026-09-25 - 03
Appendix A price adjustment (for fluctuation) methods for changes in costs, GB 50500-2013 vs GB/T 50500-2024: weighting coefficient basis and adjustment threshold differences
The two editions share the same formula skeleton in Appendix A (index-ba…
GB/T 50500-2024 建设工程工程量清单计价标准(App. A、第8.7节、App. G)GB 50500-2013 建设工程工程量清单计价规范(App. A、第9.8节)2026-09-25 - 04
Railway 2024 quota: distinguishing surveyed-price materials from base-period-price materials — the Appendix A computer-code test and the main-material list (TB 10811/10801/10813-2024)
The sole test for surveyed-price vs base-period-price materials: check w…
TB 10811-2024 铁路基本建设工程设计概(预)算费用定额(第 2.2.2、2.2.3、2.2.4、2.2.5 条,App. A Table A.0.1)TB 10801-2024 铁路基本建设工程设计概(预)算编制办法(第 4.1.1、4.1.2 条)TB/T 10813-2024 铁路工程材料基期价格(第 1.0.2~1.0.6 条)2026-09-25