Railway general estimate (budget) chapter table, Chapters 1-11: chapter order, section numbers and detailed cost contents per chapter (TB 10801-2024 Appendix A)

Per Appendix A 'General estimate (budget) chapter table' of TB 10801-2024 'Measures for compiling design estimates (budgets) of railway capital construction projects', Chapters 1-11 (all in Part 1 static investment (excluding price fluctuation provision and financing costs)) are: 1 demolition and land acquisition; 2 subgrade; 3 bridges and culverts; 4 tunnels and open cuts; 5 track; 6 communication, signalling, information and disaster monitoring; 7 power and electric traction supply; 8 housing; 9 other operating-production equipment and buildings; 10 heavy temporary works and transition works; 11 other costs; with section numbers 0101, 2-4, 5-9, 10-11, 12-14, 15-18, 19-20, 21-22, 23-29, 1030. Under each section, costs are split into I construction works cost / II installation works cost / III permanent equipment procurement cost / IV other costs.

Applicable Codes

  • TB 10801-2024 铁路基本建设工程设计概(预)算编制办法:第 2.5 节、第 2.3.3 条、第 3.8 节、第 3.11 条、App. A Table A.0.1、App. B Table B.0.15

Topic Positioning

This card sorts out the chapter order, section-number ranges and cost contents of Chapters 1-11 of Appendix A 'General estimate (budget) chapter table' of TB 10801-2024 — index knowledge for 'matching chapters and numbers, gathering costs' when compiling railway general estimates (budgets).

Core Conclusions

Overall frame (clause 2.5.1): design estimate (budget) costs divide by works and cost category into four parts, seventeen chapters. Chapters 1-11 all lie in Part 1 static investment (excluding price fluctuation provision and financing costs) (Chapters 1-13); Chapter 14 price fluctuation provision and Chapter 15 construction-period loan interest are Part 2 dynamic investment; Chapter 16 locomotive and rolling stock (EMU) procurement cost is Part 3; Chapter 17 initial working capital is Part 4. The general estimate (budget) is assembled from item estimates in Appendix A chapter order (clause 2.3.3); each chapter has sections, and under sections costs are split I construction works cost / II installation works cost / III permanent equipment procurement cost / IV other costs; chapters without costs keep their numbers and names.

Chapter details (no. | name | sections | cost contents): 1 | Demolition and land acquisition | 0101 | relocated roads (classified highways etc., construction works costs); land acquisition (leasing) and demolition compensation items: acquisition/demolition working funds, land-boundary survey fees, land pre-review fees, forest-vegetation restoration fees, overlain-mineral compensation, soil-and-water conservation compensation, grassland-vegetation restoration fees, wetland restoration fees; 2. crop compensation — for formal works built outside the railway land boundary; 3. comprehensive-development land; 4. sound-insulation windows.

2 | Subgrade | 2-4 | unit 'subgrade km' (including ground-station yard length). Section 2: section subgrade earthworks (earth and rock): cutting excavation, embankment filling (including transitions), removal of swamp silt and permafrost etc.; excludes bridge-head cone earthworks (earth and rock) and the gap behind abutments; construction works costs subdivided into soil (excluding Group A, Group B, A/B fills), rock, etc.; Section 3: station-yard earthworks (earth and rock); Section 4: subgrade appurtenant works.

3 | Bridges and culverts | 5-9 | super-major bridges, major bridges, medium/minor bridges, frame bridges, culverts.

4 | Tunnels and open cuts | 10-11 | tunnels, open cuts.

5 | Track | 12-14 | main line, station tracks, track-related works.

6 | Communication, signalling, information and disaster monitoring | 15-18 | communication, signalling, information, disaster monitoring.

7 | Power and electric traction supply | 19-20 | power, electric traction supply.

8 | Housing | 21-22 | passenger station buildings, other houses.

9 | Other operating-production equipment and buildings | 23-29 | water supply and drainage, locomotive depot, rolling stock, EMU, station yard, permanent way, other buildings and equipment. Other buildings and equipment (main-line km) include: noise-reduction works (raised walls, sound barriers on subgrade and bridges), ice-making plants, washing/disinfection stations, safety and civil-defence facilities (platform screen doors and gates, protective/fire doors — those independently set for tunnels etc., excluding those belonging to the housing part; civil-defence facilities — protection, sealing, airtight and partition facilities; flood-prevention facilities — mainly flood gates etc.).

10 | Heavy temporary works and transition works | 1030 | 1. Heavy temporary works (construction works costs): (1) railway diversion lines (km, including temporary bridges/culverts/tunnels and maintenance; off-site line = from the stock-rail joint of the junction turnout to the stock-rail joint of the first turnout inside the yard/plant; on-site line = beyond that); (2) motor-transport temporary haul roads (new trunk roads, new branch roads, rebuilt/widened roads, all including temporary bridges/culverts/tunnels and maintenance, and compensation for using existing local roads); (3) girder-transport temporary haul roads; (4) temporary water supply (trunk mains, tunnel-source-to-mountain-tank lines, deep wells — over 50 m, including drilling, pump-house, pumping plant, water stations — only temporary storage stations in water-scarce areas); (5) temporary power supply (temporary trunk lines, permanent-temporary combined lines — only costs caused by temporary supply, concentrated power/substations); (6) temporary communication base stations; (7) temporary yards — including site earthworks (earth and rock), ground treatment, hardened production areas, masonry, gantry-crane tracks for cranes >=10 t and >=100 m etc., with temporary land costs into Chapter 1 (details: material yards, centralized fill processing stations, centralized concrete mixing plants, precast concrete yards, girder fabrication/storage yards (box/T/segment girders), steel-girder assembly yards, TBM/shield assembly yards, shield slurry plants, segment yards (including main plant buildings), invert arch yards, track-section assembly yards, track-laying bases, transfer stations, ballast storage yards, sleeper (track-slab) precast yards (including main plant buildings), self-built aggregate/ballast yards); (8) tunnel sewage treatment stations — temporary stations treating tunnel discharge during construction for special environmental requirements; (9) other heavy temporary works (ferry crossings and wharves, overpasses and underpasses, floating and suspension bridges — all for motor traffic serving construction). 2. Transition works (construction works costs): (1) railway diversion lines and bridges (with maintenance); (2) track; (3) station yards; (4) communication; (5) signalling; (6) information; (7) power; (8) electrification.

11 | Other costs | — | static-investment costs payable from capital construction investment other than cost of works (construction and installation), permanent equipment procurement cost, value added tax (VAT) and basic (physical) contingency (clause 3.11.1), including: land acquisition (leasing) and demolition compensation, project-construction management fees, owner's stamp duty and other taxes, project preliminary-stage fees, construction supervision fees, survey and design fees, design-document review fees, other consulting fees, construction coordination on operating lines, statutory work safety levy (earmarked funds), research and test fees, integrated testing and commissioning related fees, foreign-capital related costs, production-preparation costs, third-party monitoring fees, plateau/high-cold health-protection fees, living-supplies transport subsidy, whole-process engineering consulting fees, others.

Applicable Boundaries

  • Compiled per Appendix A of TB 10801-2024 (published by National Railway Administration Announcement No. 28 of 2024, effective 1 January 2025); not applicable to the abolished TZJ 1001-2017 chapter table.
  • The chapter table is for assembling the general estimate (budget) by chapter; item-estimate compilation and adjustment for price differentials have their own basis, outside this card.
  • Section details may be adjusted to circumstances, but chapter numbers and names (including cost-free chapters) are retained (clause 2.3.3).
  • Chapter and cost attribute are not one-to-one: I/II/III/IV can coexist within a chapter (Chapter 1 has both relocated-road construction costs and acquisition/demolition other costs); same-attribute costs can straddle chapters ('other costs' items scatter across chapters and concentrate in Chapter 11) — compile by the dual basis 'chapter + cost attribute' to avoid omissions or double counting.
  • Temporary-land costs of Chapter 10 temporary yards go into Chapter 1; do not double-count in Chapter 10.

Further Reading

  • Source: TB 10801-2024, section 2.5 (four parts, seventeen chapters; six static-investment cost kinds), clause 2.3.3 (general-estimate assembly rules), section 3.8 (heavy temporary works and transition works costs), clause 3.11 (other costs).
  • Chapter details: Appendix A 'General estimate (budget) chapter table' (Table A.0.1), Chapters 1-11; Appendix B Table B.0.15 (foreign-capital general-estimate table) — chapter/section numbers consistent with the body.
  • Extended reading: the four-part seventeen-chapter frame (see the cited frame card); the 19 sub-items of Chapter 11 other costs; Chapter 10 heavy temporary works compilation depth (scale by the project execution plan (construction methodology and site organization), applying quota items for actual calculation); Chapter 1 acquisition/demolition and 'three-network' relocation responsibility; the 'use and location' test for temporary haul roads into heavy/minor temporary works.