static investment (excluding price fluctuation provision and financing costs)
- 01
Definition, chapter attribution and computation of the basic contingency and the price fluctuation provision in railway works (TB 10801-2024 Sections 3.13 / 3.14; TB 10811-2024 Article 2.14.1)
The railway basic contingency means costs reserved for the construction…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法(第2.5.1、3.13、3.14节)TB 10811-2024 铁路基本建设工程设计概(预)算费用定额(第2.14节)JTG 3830-2018 公路工程建设项目概算预算编制办法(第3.4节)2026-10-12 - 02
Railway general estimate (budget) chapter table, Chapters 1-11: chapter order, section numbers and detailed cost contents per chapter (TB 10801-2024 Appendix A)
Per Appendix A 'General estimate (budget) chapter table' of TB 10801-202…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法:第 2.5 节、第 2.3.3 条、第 3.8 节、第 3.11 条、App. A Table A.0.1、App. B Table B.0.152026-09-25 - 03
Railway preliminary estimate (and budget) four-part, seventeen-chapter cost system: static/dynamic investment division and cost attribution (TB 10801-2024 Section 2.5)
Per TB 10801-2024 2.5.1, design preliminary estimate (and budget) costs…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第2.5.1条、第2.5.2条TB 10801-2024 App. A 综合概(预)算章节Table A.0.1TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works2026-09-25 - 04
Composition and booking of "other costs" in railway estimates (budgets) (TB 10801-2024 Clause 3.11; Chapter 11 other costs)
Other costs are "static-investment costs payable from capital constructi…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法(第 2.5 节、2.6 节、3.11 条)TB 10811-2024 铁路基本建设工程设计概(预)算费用定额2026-09-25 - 05
Railway basic contingency (基本预备费) charging rule: base and rate (TB 10811-2024 clause 2.13.1) and applicability by compilation stage
Railway estimate (budget) basic contingency is computed on the base of t…
TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works 第2.13.1条TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第2.5.1、2.5.2、3.13条TB 10504-2018 · Measures for Compilation of Pre-Feasibility Study, Feasibility Study and Design Documents of Railway Construction Projects2026-09-25