measurement and valuation for payment (railway practice)
- 01
Whether completed but unaccepted sub-divisional work items can be measured and claimed for progress payment: the quality-pass threshold to measurement and the negative rules barring valuation, exceptions for causes not attributable to the contractor and the measurement of rework quantities, the timing distinction between pre-concealment measurement and the final account, and the deduction rules when quality failures are found after measurement
Passing quality acceptance is a substantive threshold to measurement, no…
GB/T 50500-2024 建设工程工程量清单计价标准 第7.1.1、7.1.2、7.1.5、7.1.8条GB/T 50500-2024 第7.6.1、7.6.4条GB/T 50500-2024 第8.11.10条2026-10-25 - 02
Classification, compilers and roles of stage-wise investment control documents (class A13) in railway construction projects - TB 10443-2010 Section 5.13
Per TB 10443-2010 Code for Management of Railway Construction Project Re…
TB 10443-2010 铁路建设项目资料管理规程 第5.13节(投资控制资料 A13)2026-10-11 - 03
Preventing over-settlement and duplicate settlement of subcontracted quantities: dual-signature locking of measurement + interim settlement by construction stage merged into the final account + the list of items not measured
Preventing over-settlement/duplicate settlement relies on procedural con…
GB/T 50500-2024 第7.1.7、7.1.8、7.5.5、9.1.13、10.2.3、10.3.12条TB 10402-2019 第6.0.1~6.0.8条DB37/T 5028-2022 第6.2.4条2026-09-25 - 04
Mapping railway work-acceptance valuation to costs and revenue: code mapping + three synchronizations + three-way comparison (monthly profit/loss analysis)
Using estimate-chapter/contract-BOQ codes as the common axis: revenue is…
TB 10402-2019 铁路建设工程监理规范TB 10443-2010 铁路建设项目资料管理规程GB/T 50326-2017 建设工程项目管理规范2026-09-25 - 05
Core differences between railway work-acceptance valuation and building progress payments: positioning, pricing basis, procedure, non-valuable list, and payment rules
Railway work-acceptance valuation is an investment-control tool (approve…
TB 10402-2019 铁路建设工程监理规范GB/T 50500-2024 建设工程工程量清单计价标准T/HAEC 011-2024 工程监理资料管理标准化与信息化工作指南(铁路工程)2026-09-25 - 06
Four-basis accounting for construction enterprises: computing and reporting construction in progress, completed-but-unsettled, settled-but-unfinished, and contract liabilities
Construction in progress belongs to the cost basis (counted month-end, v…
《企业会计准则》(财政部令第5号)《企业会计准则第14号——收入》(财会〔2017〕22号)GB/T 50326-2017 建设工程项目管理规范2026-09-25