How to look up 'no deduction / deduction' threshold clauses in the measurement rules (enumerated item by item in the appendix rule column, judged by the area of a single opening at 0.3m2), with a threshold comparison table for concrete, formwork, masonry and flooring
'No deduction' clauses are written item by item in the 'quantity measurement rule' column of the appendix tables of the measurement standards, and the determination rests on three elements: the comparison object is the area of a single opening (not the total opening area, not the share of member volume); the direction is 'no more than 0.30m2 (within) - no deduction, above 0.30m2 (beyond) - deduct' (equal to the threshold counts as no deduction); and the measurement form distinguishes volume from area (formwork by contact area). Reinforcement, bolts, embedded plates and grouting ducts inside members are never deducted, but the structural steel of steel skeletons is deducted; cast-in-place walls and slabs and cast-in-place members of municipal bridges, culverts and pipeline networks all take the single opening of 0.3m2 as the boundary; in masonry, beam heads, slab ends and the like and other single openings no more than 0.30m2 are not deducted, and waistbands, cantilevered eaves and door and window linings projecting from the wall face are not added; monolithic flooring does not deduct partition walls, columns and pilasters no more than 0.3m2, attached chimney flues and openings, and openings at doorways and voids are not added, while for tile and stone finishes the openings are merged in. Net quantity = quantity by drawn dimensions - deductible items + items to be merged in; missing the companion sentence 'the sides of openings are likewise not added / the projecting part is merged in' makes the quantity wrong.
Applicable Codes
- GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准(App. D Table D.1.1、App. E 现浇混凝土构件通用说明与Table E.5.1、App. L Table L.1.1)
- T/ZS 0461-2023 房屋建筑工程造价BIM计量应用规范 第7.2.1条
- SJG 181.2-2024 市政工程消耗量标准 Vol. 2 桥涵工程 第2.2.1条
- DB11/T 2382-2024 建设工程施工消耗量标准 第7.4.12条
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程 册说明
- 江苏省建筑与装饰工程消耗量标准(墙、梁、板、楼地面章节说明)
- 湖南省房屋建筑与装饰工程消耗量标准(砌体、楼地面章节说明)
Topic positioning
This card covers the location and look-up method of 'no deduction / deduction' threshold rules in the quantity measurement standards: how such clauses are enumerated item by item in the appendix measurement-rule column, how to decide whether a given opening is deducted, and a comparison of threshold criteria across four mainstream work categories - concrete, formwork, masonry and flooring. The point is not memorising general principles but being able to locate the rule, read its three elements, and avoid carrying a criterion across measurement forms.
Core conclusions
I. Clause location and enumeration (four steps)
- Fix the rule version first (the contractually agreed version prevails and governs every conclusion below).
- Locate the appendix tables: the rules sit in the 'quantity measurement rule' column of the work-item appendix tables (columns fixed as: item code / item name / item description / unit of measurement / measurement rule / work content). For buildings see GB/T 50854-2024: table D.1.1 brick masonry (code 010401), table E.5.1 concrete formwork (code 010505), table L.1.1 screeds and monolithic finishes (code 011101), plus appendix E 'general notes for cast-in-place concrete members'; for railway buildings see the volume notes of TB/T 10831-2024 Railway Works Budget Quota Manual Volume 10 Building Works, where the rules run in paragraphs without appendix tables.
- Read the rule column for three elements: (1) the comparison object is the area of a single opening (S), not the total opening area and not the share of the member volume; (2) the direction is 'no more than (within) - no deduction, above (beyond) - deduct', and equal to the threshold counts as no deduction; (3) the measurement form is volume (m3), area (m2) or formwork contact area (m2) - the same member carries a separate threshold under each form and they must not be swapped.
- Always read the companion sentence: a clause saying 'no deduction' is usually followed by 'the formwork to the opening sides (area) is likewise not added' or 'the part projecting from the wall face is merged in'. Within the threshold: no deduction of volume / area and no addition for the sides (neither moves); beyond the threshold: the member body is deducted and the sides merged in per the rule - the two run in opposite directions, and missing one sentence makes the net quantity wrong.
II. Cross-discipline threshold comparison (governing clauses)
| Work item and governing clause | Threshold and determination |
|---|---|
| GB/T 50854-2024 appendix E, general notes for cast-in-place concrete members, clause 2 | 'For cast-in-place reinforced concrete members, the volumes occupied by reinforcement, bolts, embedded plates and grouting ducts inside the member are in no case deducted, but the volume occupied by the structural steel of the steel skeleton shall be deducted' - no 0.3m2 threshold is set; embedded items inside members are never deducted |
| T/ZS 0461-2023 clause 7.2.1 item 3; Jiangsu 2026 consumption standard chapter 5 walls (1) | Cast-in-place concrete walls 'deduct the volumes of door and window openings and of single openings larger than 0.3m2; wall pilasters and parts projecting from the wall face are merged into the wall volume'; where the wall meets a column measure to the column face, where it meets a beam measure to the beam soffit |
| T/ZS 0461-2023 clause 7.2.1 item 6; Jiangsu 2026 slabs (1)(4) | Cast-in-place slabs 'do not deduct the volumes of columns, pilasters and openings each with an area no more than 0.3m2'; solid floor slabs do not deduct openings up to 0.3m2 and slab ends built into masonry walls are merged in; sloped roof slabs follow the same criterion and the thickened concrete at ridge intersections is merged in |
| Jiangsu 2026 retaining walls (2) | Measured by volume from the drawn dimensions; 'no deduction for the volume of weep holes' (no area threshold) |
| SJG 181.2-2024 clause 2.2.1 | Cast-in-place blinding, foundations, pile caps, beams, pier shafts and abutment shafts are measured in m3 by solid volume; 'no deduction for the volumes of reinforcement, wire, iron inserts, reserved grouting ducts and bolts; for cast-in-place concrete walls and slabs, the volume of openings each with a single-opening area within 0.3m2 is not deducted' |
| DB11/T 2382-2024 clause 7.4.12 | For cast-in-place concrete of municipal pipeline networks, 'no deduction for the volumes of embedded plates, reinforcement, wall bolts and openings within 0.30m2' |
| Masonry: TB/T 10831-2024 Volume 10 volume notes; Hunan 2025 consumption standard masonry notes | No deduction for beam heads, slab ends, purlin ends, packing timber, wood joist ends, edge timbers, wood bricks, ends of door and window frames, reinforcement in brick walls, wood battens, iron inserts, steel pipes and single openings each with an area no more than 0.30m2; no addition for the volume of waistbands, cantilevered eaves, coping, sill courses, dentil bricks and door and window linings projecting from the wall face; for attached chimney flues (including ventilation and refuse shafts) no deduction for the volume of each opening with a cross-section below 0.1m2 |
| Floors: Hunan 2025 floor notes; Jiangsu 2026 floor notes | Monolithic finishes and screeds deduct structures projecting above the floor, equipment foundations and indoor trenches, do not deduct partition walls, columns and pilasters up to 0.3m2, attached chimney flues and openings, and add nothing for openings at doorways, voids, radiator pockets and niches; for tile and stone finishes the openings are merged in. Floor blinding deducts structures, equipment foundations, indoor pipes and trench volumes, not columns, pilasters, partition walls, attached chimney flues or openings within 0.3m2, and adds nothing for openings |
| Formwork | Single openings within 0.3m2 are not deducted and the formwork to the opening sides is not added; beyond 0.3m2 the opening is deducted and the formwork area to its sides merged in |
| Vertical thermal insulation: TB/T 10831-2024 volume notes | Wall insulation is measured by area, deducting door and window openings and the areas of beams and openings above 0.30m2; the sides of door and window openings and columns connected to the wall are merged into the insulated wall |
III. Deduction rules and the BOQ net-quantity criterion Net quantity = quantity computed from the drawn dimensions - deductible items + items to be merged in. Within the threshold: volume / area not deducted, sides not added (neither moves); beyond the threshold: the member body is deducted and the sides merged in per the rule (opposite directions). Determination may not be replaced by 'the total opening area share is tiny', 'actual site usage' or 'actual formwork contact area'; BOQ quantities and quota quantities must each be computed under the rule column of the standard they belong to, without cross-borrowing.
IV. Dispute handling for missed and wrong deductions Where the contract stipulates measurement rules, the stipulation prevails; absent or unclear stipulation, apply the national standard matching the contract category, and only where the national standard is silent turn to industry or local standards (the criterion of clause 4.3.1 of the construction cost expert assessment work guideline). So when reviewing dropped items, first lock down which version and which rule column governs the work item, then check whether the net quantity misses required deductions or wrongly deducts items within the threshold; the current-edition rules may not be used to overturn the contractually agreed version by default.
Applicability boundaries
- The threshold always follows the verbatim text of the rule column of the governing version and discipline for that work item; 0.3m2 is not a universal constant. Local standards and quota notes carry different combinations such as 0.30m2, 0.1m2 (attached chimney flue openings), or openings within 0.3m2 not deducted while free-standing columns are deducted - carrying a criterion across standards, disciplines or measurement forms is an error.
- The 0.3m2 threshold targets only the 'area of a single opening'; it does not apply to embedded items inside members (reinforcement, bolts, embedded plates and grouting ducts are never deducted) and does not shield the structural steel of steel skeletons (always deducted).
- Items the rules say are 'merged in' or 'not added' may not be operated in reverse; opening sides are not added under volume rules but must be merged in beyond the threshold under formwork rules - the two cannot be transplanted onto each other.
- This card covers measurement-rule criteria only and contains no unit rates, percentage rates or quota consumption quantities.
Further reading
- GB/T 50854-2024 Standard for quantity take-off of building and decoration works: appendix D table D.1.1 brick masonry (010401); appendix E general notes for cast-in-place concrete members clause 2 and table E.5.1 concrete formwork (010505); appendix L table L.1.1 screeds and monolithic finishes (011101).
- T/ZS 0461-2023 Code for BIM measurement application in building works cost, clause 7.2.1; SJG 181.2-2024 Consumption standard for municipal works Volume 2 bridges and culverts, clause 2.2.1; DB11/T 2382-2024 Consumption standard for construction works, clause 7.4.12.
- TB/T 10831-2024 Railway Works Budget Quota Manual Volume 10 Building Works, volume notes (masonry and vertical thermal insulation sections).
- Chapter notes of the relevant local consumption standards (masonry works, flooring works, formwork works).
Keywords
- 不扣除
- 应扣除
- 单个孔洞面积
- 0.3m2阈值
- method of measurement
- 附录计算规则栏
- 净量口径
- 漏扣错扣