Statutory deadlines and interest rules for returning bid bonds (Regulations Articles 57/35/66: principal plus bank interest within 5 days of contract signing; withdrawal before deadline returned within 5 days; withdrawal after deadline may be forfeited)

The tenderer shall, at the latest within 5 days after signing the written contract, return bid bonds plus bank interest of the same period to the winner and losers (Article 57 - running from contract signing, not award or the notice); for withdrawals notified in writing before the bid deadline, return within 5 days of receiving the written withdrawal notice (35(1)); for withdrawals after the deadline, the tenderer may (not must) refuse return (35(2)); over-collection or failure to return per rules: correction ordered, fine up to 50,000 yuan, plus damages (Article 66).

Applicable Codes

  • 《中华人民共和国招标投标法实施条例》(国务院令第709号,2019修订)第五十七条、第三十五条、第六十六条
  • 《中华人民共和国招标投标法》第四十六条
  • 《工程建设项目货物招标投标办法》(国家发展改革委等9部委令第23号,2013修正)第五十二条
  • 《建设工程交易规范》DBJ/T 15-115-2016 第6.8.1条(广东省)

Topic Positioning

Statutory deadlines, interest, and penalties for returning bid bonds: the two return duties - after award (within 5 days of contract signing) and on pre-deadline withdrawal (within 5 days of the written notice) - the boundary where post-deadline withdrawal may be forfeited, and administrative liability for late return, per the Implementation Regulations (Decree No. 709, 2019, current).

Core Conclusions

  1. Post-award return: Article 57: "The tenderer shall, at the latest within 5 days after the written contract is signed, return the bid bonds and bank interest of the same period to the winning and losing bidders." The trigger is contract signing - not award or the notice; per Bidding Law Article 46 the contract is signed within 30 days of the notice, so the statutory latest point is 5 days after signing; earlier return is allowed.
  2. Losers included: Article 57 says "to the winning and losing bidders"; the Measures for Tendering of Goods (NDRC et al. Order No. 23, 2013 revision) Article 52 requires "one-time return of bid bonds and bank interest to the winning and losing bidders".
  3. Interest: principal plus bank interest of the same period. The Regulations set no rate tier; local rules refine - Guangdong DBJ/T 15-115-2016 Clause 6.8.1: "interest at the bank's current deposit rate for the same period", with the standard to be agreed in the tender documents; absent statutory text, follow the documents.
  4. Withdrawal before the deadline: Article 35(1): "A bidder withdrawing its submitted bid documents shall notify the tenderer in writing before the bid deadline. If a bid bond has been taken, it shall be returned within 5 days of receiving the written withdrawal notice."
  5. Withdrawal after the deadline: Article 35(2): "Where a bidder withdraws its bid documents after the bid deadline, the tenderer may refuse to return the bid bond." - "withdraw before deadline = must return; withdraw after = may retain" is the most disputed line in practice. Whether pre-deadline withdrawal interest is due is unsaid in Article 35 (unlike 57); some local standards require interest as well; absent text, follow the documents.
  6. Penalty for late return: Article 66: "A tenderer collecting bid or performance bonds beyond the prescribed ratio or failing to return bid bonds and interest per the rules shall be ordered to correct by the administrative supervision department and may be fined up to 50,000 yuan; losses caused to others shall be compensated according to law."

Applicable Boundaries

  • Current basis: Decree No. 709 (2019); goods procurement also applies Order No. 23 Article 52 ("within 5 days after contract signing... one-time return").
  • Two different triggers: withdrawal return - 5 days from receipt of the written withdrawal notice; post-award return - 5 days after contract signing; do not mix.
  • Article 57 also requires the contract's subject, price, quality, and duration to match the tender and winning bid, with no other agreement departing from substantive content - triggered at signing.
  • No unified rate tier in the Regulations; Guangdong's current-deposit-rate rule is local refinement; elsewhere follow the documents or local rules.

Further Reading

  • Implementation Regulations (Decree No. 709, 2019) Articles 57, 35, 66; Bidding Law Article 46 (contract within 30 days of the notice).
  • Measures for Tendering of Goods (Order No. 23, 2013 revision) Article 52.
  • Guangdong DBJ/T 15-115-2016 Clause 6.8.1 (interest at current deposit rate; agreed in advance in the documents).