A determination framework for whether curtain-wall design-development (detail design) costs are included in the contract price: the watershed is to whom the development obligation belongs

Whether curtain-wall design-development costs are included in the contract price depends on "whose contractual obligation the development is": development necessary for the contractor's construction (fabrication drawings, subdivision layout, embedded part positioning, edge detailing, etc.) is the contractor's obligation, its cost already amortized into all-in unit rates/measure costs, not charged again; special designs, curtain-wall consultants, and BIM consulting separately commissioned by the employer are design services commissioned by the employer, outside the construction contract price, contracted and charged separately. Judge by the contract agreement, whether the development changes the design intent, whether the tender BOQ lists it separately, and the positioning in industry specifications; the tender documents and special contract conditions prevail.

Applicable Codes

  • GB/T 50500-2024 建设工程工程量清单计价标准
  • T/AACPM 008-2025 建筑幕墙工程项目管理规程
  • SJG 77-2020 房屋建筑工程造价文件分部分项和措施项目划分标准
  • DB11/T 1745-2020 建筑工程施工技术管理规程
  • RISN-TG 027-2017 建筑幕墙工程咨询导则

Topic Positioning

A general framework for determining whether the design-development costs of curtain walls (and similar specialist subcontracts) are included in the construction contract price; the core watershed is "whose contractual obligation the design development is".

Core Conclusions

Design development necessary for the contractor's construction (component fabrication drawings, unit subdivision layout, embedded part positioning, edge detailing — refinements needed to complete the contracted works) is the contractor's contractual obligation, its cost usually already amortized into all-in unit rates or measure costs, not charged again; special designs, curtain-wall consultants, and BIM consulting separately commissioned by the employer are design services commissioned by the employer, outside the construction contract price, contracted and charged separately. Four determination paths: (1) the contract agreement (decisive) — GB/T 50500-2024 Clause 2.0.25 defines "construction design development" as the refinement design the contractor is responsible for per the contract, and Clause 6.2.6 requires bidders to quote autonomously per their own implementation plans and bear the contractor's risks; (2) whether the development changes the design intent — changing the structural system, panel material, or functional zoning is a design change, going through price-adjustment procedures rather than repeated charging of development fees; (3) whether the tender BOQ lists it separately — if not, the cost is amortized through all-in unit rates (SJG 77-2020 curtain-wall divisional items have no "design development fee"); (4) the positioning in industry specifications — T/AACPM 008-2025 Clauses 2.0.5, 4.4.1 position design development as construction-process management content subject to review by the project management organization.

Applicable Boundaries

Applies to determining the attribution of design-development costs of BOQ-priced building curtain walls and similar specialist subcontracts (doors and windows, fine decoration, etc.); the tender documents and special contract conditions prevail. Not applicable to design/consulting contracts separately awarded by the employer (their fees are negotiated by commission scope and depth, e.g., RISN-TG 027-2017 Clause 5.3.3 BIM consulting fees); it does not resolve the cooperation fee for reviewing development drawings or the price calculation of design changes themselves. At tendering it is prudent to state the development depth, deliverables, the obligation to cooperate with the original designer's review and signature, and the cost attribution; reference may be made to RICS NRM listing contractor design fees as a separate cost element for comparison and claims.

Further Reading

GB/T 50500-2024 Clauses 2.0.25, 6.2.6; T/AACPM 008-2025 Clauses 2.0.5, 4.4.1; SJG 77-2020 Clause 5.9.1; DB11/T 1745-2020 Clause 9.0.7 (development deliverables) and Clause 9.0.14 (development drawings subject to review and signature by the original design unit); RISN-TG 027-2017 Clause 5.3.3; RICS NRM (the practice of listing contractor design fees separately).