High-strength bolt connections in steel structures: friction-surface treatment and slip-factor testing, and the 2-3 exposed threads requirement after final tightening (GB 50205-2020 / GB 50755-2012 / GB 55006-2021 / DB11/T 1832.5-2023)

The friction surfaces of high-strength bolt connections shall be kept dry and clean, free of flashes, burrs, welding spatter, weld scars, scale, and dirt (GB 50755-2012 Clause 7.2.5); except where required by the design, the friction surfaces shall not be painted (DB11/T 1832.5-2023 Clause 11.5.7); the surface treatment method and rust-removal grade shall meet the design documents, and the friction surfaces of slip-critical connections shall undergo slip-factor testing and retesting after treatment (GB 55006-2021 Clause 7.1.3, a mandatory provision); slip-factor verification runs one batch per 50,000 bolts, each of two or more treatment processes is tested, 3 specimen sets per batch, two-surface two-bolt specimens, final tightening preload 0.95P-1.05P (GB 50205-2020 Appendix B.0.7); after final tightening, bolt threads shall be exposed by 2 to 3 threads, with 10% of bolts allowed at 1 or 4 threads, checked by visual inspection over 5% of nodes and not fewer than 10 (GB 50205-2020 Clause 6.3.6).

Applicable Codes

  • GB 50755-2012 钢结构工程施工规范 第7.2.5条
  • GB 55006-2021 钢结构通用规范 第7.1.3条(强制性条文)
  • GB 50205-2020 钢结构工程施工质量验收标准 第6.3.6条、App. B.0.7
  • GB 50205-2001 钢结构工程施工质量验收规范 第6.3.1条(条文说明,已由2020版替代)
  • DB11/T 1832.5-2023 建筑工程施工工艺规程 第5部分:钢结构工程 第11.4.3、11.5.6、11.5.7条

Topic Positioning

Two core control requirements for the construction and acceptance of high-strength bolt connections in steel structures: (1) friction-surface condition, treatment method, and slip-factor verification; (2) the number of exposed bolt threads after final tightening. Covers the relevant clauses of GB 50755-2012 "Code for construction of steel structures", GB 50205-2020 "Standard for construction quality acceptance of steel structure works", GB 55006-2021 "General code for steel structures", and the Beijing local standard DB11/T 1832.5-2023 "Construction work procedure specifications for building works, Part 5: steel structure works".

Core Conclusions

  1. Friction-surface requirements (construction process control) Clause 7.2.5 of GB 50755-2012: the friction surfaces of high-strength bolt connections after surface treatment shall meet the following:
  1. The friction surfaces shall be kept dry and clean, free of flashes, burrs, welding spatter, weld scars, scale, and dirt;
  2. The treated friction surfaces shall be protected, and no marks shall be made on them;
  3. Where a rusting treatment is used, floating rust shall be removed before erection with a fine wire brush stroked perpendicular to the direction of the member force. Clause 7.1.3 of GB 55006-2021 (mandatory throughout): the surface treatment method and rust-removal grade of the steel plates at high-strength bolt connections shall meet the design documents. For slip-critical high-strength bolt connections, the slip factor shall be tested and retested after friction-surface treatment, and the results shall reach the slip-factor indices specified in the design documents. Commentary points: oil on the plate surface greatly reduces the slip factor, so the surface shall be free of oil; different surface treatment methods directly affect the slip-factor value, so fabrication must treat surfaces per the design; slip-factor test and retest methods shall comply with the current relevant national standards. DB11/T 1832.5-2023 Clause 11.5.7: the friction surfaces of high-strength bolt connections shall be dry and clean, free of flashes, burrs, welding spatter, weld scars, scale, and dirt. Except where required by the design, the friction surfaces shall not be painted. DB11/T 1832.5-2023 Clause 11.4.3 (construction provisions): bolt assemblies shall arrive in matched lots and be used within the same lot without mixing; before use, visual inspection (oil film normal and uncontaminated, threads intact); bolts shall not be rain-soaked or exposed to soil or oil; before erection, floating rust, flashes, burrs, oil, paint, and protective film shall be cleaned off; when assembling, the side of the nut with the round collar shall face the chamfered side of the washer, and the chamfered side of the washer under large hexagon heads shall face the bolt head; insertion direction follows construction convenience, striving for consistency; during erection the friction surfaces shall be dry and work in rain is forbidden; initial tightening, re-tightening, and final tightening should be completed within one day, with construction records kept.
  1. Slip-factor verification (GB 50205-2020 Appendix B.0.7)
  1. Inspection lot: divided by the high-strength bolt usage of each unit (sub-unit) work - one lot per 50,000 high-strength bolts, and less than 50,000 counts as one lot. Where two or more surface treatment (including coated friction surfaces) processes are used, the slip factor of each process shall be verified, 3 specimen sets per lot.
  2. Specimens: tension specimens of two-bolt splices with two friction surfaces; the specimens and the represented structural members shall be of the same material, fabricated in the same batch, with the same friction-surface treatment process and the same surface condition (including coating), stored under the same environmental conditions, and joined with high-strength bolt assemblies of the same batch and performance grade. The specimen plate thickness shall keep the net section elastic until slip occurs.
  3. The testing machine error shall be within 1%; high-strength bolts with strain gauges, load cells, and strain indicators shall be calibrated against the testing machine before the test, with error within 2%.
  4. Tightening is in two steps: initial tightening to about 50% of the standard preload; after final tightening, the preload of each bolt shall be within 0.95P-1.05P (P = design preload of the high-strength bolt).
  5. Loading: first apply 10% of the design slip load, hold for 1 min, then load smoothly at 3kN/s-5kN/s until slip failure, and record the slip load Nv.
  6. Slip factor mu = Nv / (nf x Sum Pi), where nf = number of friction surfaces, taken as 2; Pi = the sum of the measured preloads of the high-strength bolts on the slipping side; m = number of bolts per side of the specimen, taken as 2.
  7. On-site local treatment (commentary to Clause 6.3.1 of GB 50205-2001, superseded by the 2020 edition): where the friction surface is ground on site with an abrasive wheel, the grinding area shall be no less than 4 times the bolt hole diameter and the grinding direction perpendicular to the member force direction; unless the design uses a friction coefficient <= 0.3 and expressly waives the slip-factor test, 3 specimen sets of the same material and treatment shall be used for retesting at fabrication, plus another 3 sets for retest before erection.
  1. Exposed threads after final tightening (acceptance) Clause 6.3.6 of GB 50205-2020: after final tightening of high-strength bolt assemblies, the bolt threads shall be exposed by 2 to 3 threads, and 10% of the bolts are allowed to have 1 or 4 threads exposed. Inspection quantity: 5% of nodes by count, and not fewer than 10. Method: visual inspection. DB11/T 1832.5-2023 Clause 11.5.6 is fully identical; item 7 of its Clause 11.4.3 likewise requires 2-3 exposed threads after final tightening.

Applicable Boundaries

  • Applies to the construction and acceptance of slip-critical / bearing-type high-strength bolt connections (large hexagon head, twist-off type) in building steel structures; GB 55006-2021 is a fully mandatory general code and its Clause 7.1.3 is a mandatory provision.
  • DB11/T 1832.5-2023 is a Beijing local standard applicable to building construction procedures in Beijing; elsewhere the national standards and local provisions prevail.
  • Where the friction coefficient is <= 0.3 and the design expressly waives the slip-factor test, the test may be omitted; otherwise testing / retesting is required at both fabrication and erection.
  • This card does not cover the incoming retest of torque coefficients / tightening axial forces of high-strength bolts, determination of final-tightening torque control values, or welded and ordinary bolt connections.

Further Reading

  • GB 50205-2020 "Standard for construction quality acceptance of steel structure works": Section 6.3 fastener connection works, Appendix B inspection items of fastener connection works (B.0.7 full slip-factor test workflow, Figure B.0.7 specimen form and dimensions, Table B.0.7 specimen plate widths).
  • GB 50755-2012 "Code for construction of steel structures": Section 7.2 fastener connections (Clause 7.2.5).
  • GB 55006-2021 "General code for steel structures": Clause 7.1.3 and its commentary.
  • GB 50205-2001 "Code for construction quality acceptance of steel structure works": commentary to Clause 6.3.1 (on-site abrasive-wheel grinding of friction surfaces).
  • DB11/T 1832.5-2023 "Construction work procedure specifications for building works, Part 5: steel structure works": Sections 11.4 and 11.5 high-strength bolt connections (Clauses 11.4.3, 11.5.6, 11.5.7).