provisional quantities
- 01
Deciding claims to adjust the contract price for omitted items in the tender BOQ (BOQ errors) during performance: risk is allocated by the contract pricing method and the BOQ section in which the omission falls - omission from the work-section bills under a unit-rate contract may rest with the employer and be adjusted under section 8.2; a lump-sum contract is in principle not adjusted (except provisional quantity items); the bill of preliminaries is always the contractor's responsibility - with judicial limits and points of procedure and proof
Whether adjustment is possible depends not on the omission itself but on…
《建设工程工程量清单计价标准》GB/T 50500-2024 第3.1.8、3.5.4、4.1.4、6.1.6、6.1.7、8.1.3、8.2.1、8.2.2、8.2.3、8.9.1、8.9.2条《中华人民共和国民法典》第五百一十条、第五百三十三条、第七百九十三条最高人民法院法释〔2020〕25号《关于审理建设工程施工合同纠纷案件适用法律问题的解释(一)》第十九条、第二十二条2026-10-29 - 02
Bills of quantities errors (item description mismatches, wrong or missing items, quantity deviations): determination, attribution of responsibility and the quantity-then-price adjustment sequence, including the split between unit-rate and lump-sum contracts and the 15% threshold rule
Where the BOQ and the drawings are inconsistent, the sequence is 'decide…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.27、3.3.2、3.4.7、4.1.4、4.1.6、6.1.7、7.2.1、8.2.1、8.9.1条GB/T 50319-2013 建设工程监理规范 第6.3.3条T/ZBD 100.4-2023 建设工程造价鉴定作业指引 第4.4.4条2026-10-25 - 03
Overview of bills of quantities: composition, compilation, item descriptions and handling of errors/omissions (GB/T 50500-2024)
A bill of quantities comprises four sections — trade items, preliminarie…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50860-2013 构筑物工程工程量计算规范DBJ51/T 040-2015 四川省工程建设项目招标代理操作规程2026-09-25 - 04
Determining quantities where drawing dimensions are incomplete: three-tier fallback plus provisional quantities at the tender/preparation stage; re-measurement plus five-tier progressive determination at the settlement stage
Where drawings are incomplete, quantities are determined along two track…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50861-2013 城市轨道交通工程工程量计算规范T/ZBD 100.4-2023 建设工程造价鉴定作业指引2026-09-25 - 05
No price adjustment for BOQ defects in lump-sum contracts (BOQ quantities below drawings): the four-layer rule of GB/T 50500-2024 and the reversal of the 2013 edition's Clause 8.3.1 measure-and-value rule
Under GB/T 50500-2024 (effective 2025-09-01; GB 50500-2013 simultaneousl…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.7条/3.4.6条/4.1.6条/7.2.2条/7.4.1条/7.4.3条GB 50500-2013 建设工程工程量清单计价规范 第8.3.1条/8.3.2条(已废止)住建部发布公告:https://www.mohurd.gov.cn/gongkai/zc/wjk/art/2024/art_6186304e164c4c4982904f8734983235.html2026-09-25