Construction cost management and responsibility-centre cost overview: the six-link closed loop, cost-plan preparation and three cost bases, responsibility decomposition and assessment
Cost management is the six-link closed loop of forecasting, planning, control, accounting, analysis and assessment (GB/T 50326-2017 cl. 2.0.21). The construction cost plan is compiled by the construction enterprise around the project execution plan, unfolds along three bases — cost composition, project structure and stage of execution — and follows the six-step procedure from forecasting to tiered approval (cl. 11.2.4), with eight content items and implementation after the enterprise's authorised person approves. The cost management plan rests on the construction budget and the programme (GB/T 50502-2009 cl. 7.6.1); accounting keeps the "three synchronisations"; assessment runs on the cost reduction amount and rate; and target cost, responsibility-centre cost and planned cost interlock, responsibility being decomposed crosswise along the organisational system and the works breakdown.
An entry card for the construction cost-management domain: starting from the six-link closed loop of cost management,