Calculating fire-protection system commissioning fees: BOQ listing, measurement units, and point-count rules (GB/T 50856-2024 Appendix J, code 030909)

Fire-protection system commissioning fees are listed separately in the BOQ (GB/T 50856-2024 code 030909), not charged as a percentage of the works cost, but measured by system/point/count with commissioning items: water extinguishing control devices by points from flow indicators/hydrant pump-start buttons/monitor counts, gas extinguishing by cylinder-valve count as points, automatic alarm and other systems by device counts as points and measured by "system", fire barrier control devices by count (valves) or unit (fire lifts); when applying quotas, price by the point-tier steps of the chosen quota — local standards differ in caliber.

Applicable Codes

  • GB/T 50856-2024 App. J 消防工程
  • TB/T 10829-2024 Vol. 8 电力工程
  • SJG 111.3-2022 Vol. 3 附属设施安装工程

Topic Positioning

How fire-protection system commissioning fees are calculated: listed separately in the BOQ (GB/T 50856-2024 Appendix J "fire-protection system commissioning", code 030909), not charged as a percentage of the works cost, but priced with commissioning items by the point counts/quantities of each commissioned system.

Core Conclusions

BOQ measurement rules (Table J.9.1 + J.11.9): (1) water extinguishing control device commissioning by "points" — sprinklers by flow-indicator count, hydrants by pump-start button count, fire monitors by monitor count; (2) gas extinguishing systems by cylinder-valve count in "points"; (3) automatic alarm, fire broadcast, fire telephone, air-sampling detection, fire-door monitoring, electrical fire monitoring, and fire power supply monitoring are all counted by "system", with points = the number of devices (detectors, alarms, buttons, controllers, etc. all counted); (4) fire barrier control devices by "count" (fire shutters, positive-pressure dampers, smoke exhaust dampers, fire control dampers), fire lifts by "unit". Quota caliber example (TB/T 10829-2024 Volume 8): fire alarm system commissioning priced by system + point tiers (per 100 points within 500 points, per additional 50 points at 500 points and above, per additional 50 points above 1000 points; system joint commissioning tiered by station count).

Applicable Boundaries

The point-count caliber must distinguish the BOQ rules from those of the chosen quota: the BOQ counts points per J.11.9, while applying the quota converts by the quota steps (mind the meaning of "per 100 points/per additional 50 points" steps). Local standards differ: e.g., Shenzhen SJG 111.3-2022 distinguishes automatic alarm points by the number of central alarm controllers, counts fire barrier control devices by "location" (one valve one location), counts gas extinguishing by test capacity, and counts non-fire power cutoff by the number of execution modules. Safety measure costs for gas extinguishing commissioning are calculated separately. Commissioning content follows GB 50261-2017 and GB 50166-2019; the commissioning fee covers whole-system inspection, adjustment, and testing.

Further Reading

GB/T 50856-2024 Appendix J Table J.9.1 and the J.11.9 problem notes; TB/T 10829-2024 Volume 8 Power Works, electrical system commissioning (fire alarm system commissioning items); SJG 111.3-2022 Volume 3 Chapter 3 Fire Protection Works, Clauses 3.1.5, 3.2.4.